ITAC Assessment: UF0225
ITAC logo
ITAC Assessment: UF0225
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Underground Enclosures
NAICS
n/a
SIC 2842: Specialty Cleaning, Polishing, and Sanitation Preparations
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 40,000
ft2
Annual Production 220
ton
Production Hrs. Annual 4,732
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,539 1,548,359
kWh
Electricity Demand $6,686 4,355
kW-mo/yr
Other Energy $5,157 295
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,706 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,662

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings By-product Production Savings
01 2.7111: Reduce illumination to minimum necessary levels $9,814 $13,400 $9,814
152,696
kWh
- - -
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $8,490 $12,912 $8,490
135,404
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,544 $1,000 $1,544
33,998
kWh
- - -
04 2.6218: Turn off equipment when not in use $912 - $912
14,361
kWh
- - -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $28,729 $25,000 $(-248.0)
(-14,947)
kWh
$(-226.0)
-
kW-mo/yr
$29,203
-
lb
-
06 3.5311: Recover and reuse waste material $1,825 - - - $1,825
-
lb
-
07 4.125: $28,392 $115 - - - $28,392
TOTAL RECOMMENDED $79,706 $52,427 $20,512
321,512
kWh
$(-226.0)
-
kW-mo/yr
$31,028
-
lb
$28,392
TOTAL IMPLEMENTED $40,662 $14,515 $12,270
201,055
kWh
- - $28,392
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs