Assessment Year | 1999 |
---|---|
Principal Product | Underground Enclosures |
NAICS |
n/a
|
SIC | 2842: Specialty Cleaning, Polishing, and Sanitation Preparations |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
40,000
ft2
|
Annual Production | 220
ton
|
Production Hrs. Annual | 4,732
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $86,539 | 1,548,359 |
kWh
|
$0.056 |
Electricity Demand | $6,686 | 4,355 |
kW-mo/yr
|
$1.54 |
Other Energy | $5,157 | 295 |
MMBtu
|
$17.48 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $79,706 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $40,662 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $9,814 | $13,400 |
$9,814
152,696
kWh
|
- | - | - | |
02 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $8,490 | $12,912 |
$8,490
135,404
kWh
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,544 | $1,000 |
$1,544
33,998
kWh
|
- | - | - | |
04 | 2.6218: Turn off equipment when not in use | $912 | - |
$912
14,361
kWh
|
- | - | - | |
05 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $28,729 | $25,000 |
$(-248.0)
(-14,947)
kWh
|
$(-226.0)
-
kW-mo/yr
|
$29,203
-
lb
|
- | |
06 | 3.5311: Recover and reuse waste material | $1,825 | - | - | - |
$1,825
-
lb
|
- | |
07 | 4.125: | $28,392 | $115 | - | - | - | $28,392 | |
TOTAL RECOMMENDED | $79,706 | $52,427 |
$20,512
321,512
kWh
|
$(-226.0)
-
kW-mo/yr
|
$31,028
-
lb
|
$28,392 | ||
TOTAL IMPLEMENTED | $40,662 | $14,515 |
$12,270
201,055
kWh
|
- | - | $28,392 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs