ITAC Assessment: AS0140
ITAC logo
ITAC Assessment: AS0140
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Plastic Injection Moldings
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 130
Plant Area 54,000
ft2
Annual Production 60,000,000
pieces
Production Hrs. Annual 6,304
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $169,538 2,051,290
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,890 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,215

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,420 $22,151 $8,420
102,286
kWh
02 2.7111: Reduce illumination to minimum necessary levels $1,699 $420 $1,699
22,860
kWh
03 2.7135: Install occupancy sensors $922 $1,650 $922
15,240
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $507 $510 $507
7,034
kWh
05 2.4133: Use most efficient type of electric motors $6,786 $5,537 $6,786
85,873
kWh
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $442 - $442
7,327
kWh
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $32,114 $75,540 $32,114
435,815
kWh
TOTAL RECOMMENDED $50,890 $105,808 $50,890
676,435
kWh
TOTAL IMPLEMENTED $8,215 $7,697 $8,215
108,147
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs