Assessment Year | 1982 |
---|---|
Principal Product | PRESSURE SENSITIVE MATERIAL |
NAICS |
n/a
|
SIC | 2672: Coated and Laminated Paper, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 114 |
Plant Area |
n/a
|
Annual Production | 4,414
thousand feet
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $190,332 | 4,817,995 |
kWh
|
$0.040 |
Natural Gas | $163,775 | 43,900 |
MMBtu
|
$3.73 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $164,271 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $57,671 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Paper Savings |
---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $11,062 | $2,400 |
$11,062
279,894
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $973 | $506 |
$973
24,619
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,411 | $5,029 |
$6,411
162,368
kWh
|
- | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,125 | $1,500 | - |
$4,125
-
MMBtu
|
- | |
05 | 2.2515: Use optimum thickness insulation | $3,585 | $5,294 | - |
$3,585
-
MMBtu
|
- | |
06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,835 | - |
$3,835
-
kWh
|
- | - | |
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $656 | - |
$656
16,413
kWh
|
- | - | |
08 | 2.2437: Recover waste heat from equipment | $27,024 | $31,500 | - |
$27,024
-
MMBtu
|
- | |
09 | 3.6121: Burn waste paper for heat | $106,600 | $200,000 | - |
$138,100
-
MMBtu
|
$(-31,500.0)
-
MMBtu
|
|
TOTAL RECOMMENDED | $164,271 | $246,229 |
$22,937
483,294
kWh
|
$172,834
-
MMBtu
|
$(-31,500.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $57,671 | $46,229 |
$22,937
483,294
kWh
|
$34,734
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Paper Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs