ITAC Assessment: GT0112
ITAC logo
ITAC Assessment: GT0112
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product PRESSURE SENSITIVE MATERIAL
NAICS
n/a
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 114
Plant Area
n/a
Annual Production 4,414
thousand feet
Production Hrs. Annual 7,488
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $190,332 4,817,995
kWh
Natural Gas $163,775 43,900
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $164,271 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $57,671

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Paper Savings
01 2.7111: Reduce illumination to minimum necessary levels $11,062 $2,400 $11,062
279,894
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $973 $506 $973
24,619
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,411 $5,029 $6,411
162,368
kWh
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $4,125 $1,500 - $4,125
-
MMBtu
-
05 2.2515: Use optimum thickness insulation $3,585 $5,294 - $3,585
-
MMBtu
-
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,835 - $3,835
-
kWh
- -
07 2.6212: Turn off equipment during breaks, reduce operating time $656 - $656
16,413
kWh
- -
08 2.2437: Recover waste heat from equipment $27,024 $31,500 - $27,024
-
MMBtu
-
09 3.6121: Burn waste paper for heat $106,600 $200,000 - $138,100
-
MMBtu
$(-31,500.0)
-
MMBtu
TOTAL RECOMMENDED $164,271 $246,229 $22,937
483,294
kWh
$172,834
-
MMBtu
$(-31,500.0)
-
MMBtu
TOTAL IMPLEMENTED $57,671 $46,229 $22,937
483,294
kWh
$34,734
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Paper Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs