| Assessment Year | 2023 |
|---|---|
| Principal Product | Ice cream |
| NAICS | 311520: Ice Cream and Frozen Dessert Manufacturing |
| SIC | 2024: Ice Cream and Frozen Desserts |
| Sales Range | $1 M to 5M |
| # of Employees | 8 |
| Plant Area |
43,000
ft2
|
| Annual Production | 450,000
lb
|
| Production Hrs. Annual | 2,000
hrs
|
| Location (State) | Utah |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $148,458 | 1,587,936 |
kWh
|
$0.093 | |
| Other Energy | $81,198 | 5,497 |
MMBtu
|
$14.77 | |
| Waste Disposal Costs | |||||
| Water Usage | $10,171 | 2,729 |
Tgal
|
$3.73 | |
| TOTAL YEARLY COSTS | $239,827 | ||||
| RECOMMENDED SAVINGS* | $200,364 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $200,364 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Water Usage Savings | Increase in Production Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.452: Eliminate shift | $171,281 | $5,500 | - | - | - | - | $171,281 | |
| 02 | 2.4322: Use or replace with energy efficient substitutes | $16,735 | $51,600 | - | - |
$16,735
-
MMBtu
|
- | - | |
| 03 | 2.2622: Replace existing chiller with high efficiency model | $8,766 | $26,767 |
$1,056
10,436
kWh
|
- | - |
$7,710
-
Tgal
|
- | |
| 04 | 2.2121: Increase amount of condensate returned | $3,305 | $11,743 | - |
$2,577
-
MMBtu
|
- |
$728
-
Tgal
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $277 | $142 |
$277
2,733
kWh
|
- | - | - | - | |
| TOTAL RECOMMENDED | $200,364 | $95,752 |
$1,333
13,169
kWh
|
$2,577
-
MMBtu
|
$16,735
-
MMBtu
|
$8,438
-
Tgal
|
$171,281 | ||
| TOTAL IMPLEMENTED | $200,364 | $95,752 |
$1,333
13,169
kWh
|
$2,577
-
MMBtu
|
$16,735
-
MMBtu
|
$8,438
-
Tgal
|
$171,281 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs