Assessment Year | 1993 |
---|---|
Principal Product | Welding Wire and Bead Wire |
NAICS |
n/a
|
SIC | 3357: Drawing and Insulating of Nonferrous Wire |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
n/a
|
Annual Production | 876,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,556,906 | 39,423,799 |
kWh
|
$0.039 |
Natural Gas | $504,003 | 246,960 |
MMBtu
|
$2.04 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $135,033 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,347 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2444: Use hot process fluids to preheat incoming process fluids | $38,513 | $15,408 | - |
$38,513
-
MMBtu
|
|
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,765 | $5,359 |
$3,765
76,202
kWh
|
- | |
03 | 2.4131: Size electric motors for peak operating efficiency | $1,582 | $9,804 |
$1,582
60,668
kWh
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $91,173 | $95,556 |
$91,173
2,303,927
kWh
|
- | |
TOTAL RECOMMENDED | $135,033 | $126,127 |
$96,520
2,440,797
kWh
|
$38,513
-
MMBtu
|
||
TOTAL IMPLEMENTED | $5,347 | $15,163 |
$5,347
136,870
kWh
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs