ITAC Assessment: OK0393
ITAC logo
ITAC Assessment: OK0393
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Welding Wire and Bead Wire
NAICS
n/a
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area
n/a
Annual Production 876,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,556,906 39,423,799
kWh
Natural Gas $504,003 246,960
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $135,033 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,347

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2444: Use hot process fluids to preheat incoming process fluids $38,513 $15,408 - $38,513
-
MMBtu
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,765 $5,359 $3,765
76,202
kWh
-
03 2.4131: Size electric motors for peak operating efficiency $1,582 $9,804 $1,582
60,668
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $91,173 $95,556 $91,173
2,303,927
kWh
-
TOTAL RECOMMENDED $135,033 $126,127 $96,520
2,440,797
kWh
$38,513
-
MMBtu
TOTAL IMPLEMENTED $5,347 $15,163 $5,347
136,870
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs