ITAC Assessment: UF0229
ITAC logo
ITAC Assessment: UF0229
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Car Care and Performance Chemicals
NAICS
n/a
SIC 2842: Specialty Cleaning, Polishing, and Sanitation Preparations
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 270,000
ft2
Annual Production 2,040,000
pieces
Production Hrs. Annual 5,616
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,964 1,950,176
kWh
Electricity Demand $24,386 5,383
kW-mo/yr
LPG $7,552 564
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $82,592 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,710

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings Water Disposal Savings Other Liquid (haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,463 $17,721 $5,374
78,253
kWh
$89
-
kW-mo/yr
- - - - -
02 2.8121: Apply for tax-free status for energy purchases $14,710 $50 - - $14,710 - - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,864 - $3,864
63,306
kWh
- - - - - -
04 2.6232: Install set-back timers $703 $1,240 $703
16,706
kWh
- - - - - -
05 2.2221: Use immersion heating in tanks, melting pots, etc $10,358 $25,000 - - - $10,358
-
MMBtu
- - -
06 2.7111: Reduce illumination to minimum necessary levels $8,015 $5,980 $7,904
137,163
kWh
$111
-
kW-mo/yr
- - - - -
07 3.4155: Meter waste water $3,063 $1,500 - - - - $3,063
-
Tgal
- -
08 3.3122: Use filtration, centrifuging to remove contaminants $34,439 $50,000 - - - - - $34,439
-
gal
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,977 $1,200 $641
13,482
kWh
$7
-
kW-mo/yr
- - - - $1,329
TOTAL RECOMMENDED $82,592 $102,691 $18,486
308,910
kWh
$207
-
kW-mo/yr
$14,710 $10,358
-
MMBtu
$3,063
-
Tgal
$34,439
-
gal
$1,329
TOTAL IMPLEMENTED $14,710 $50 - - $14,710 - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings Water Disposal Savings Other Liquid (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs