*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Automotive Fluids
NAICS
n/a
SIC 2842: Specialty Cleaning, Polishing, and Sanitation Preparations
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 210,000
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $184,502 4,457,796
kWh
Electricity Demand $125,455 10,242
kW-mo/yr
Electricity Fees $43,980 -
Natural Gas $44,097 16,046
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,259 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $984

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 4.431: Train operators for maximum operating efficiency $25,500 - - - - $25,500
02 2.2621: Modify refrigeration system to operate at a lower pressure $14,677 $45,000 $11,145
254,982
kWh
$3,532
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $3,555 $1,380 $2,578
58,910
kWh
$977
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $984 $3,740 $605
13,775
kWh
$379
-
kW-mo/yr
- -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $894 - - - $894
-
lb
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $649 - $493
11,137
kWh
$156
-
kW-mo/yr
- -
TOTAL RECOMMENDED $46,259 $50,120 $14,821
338,804
kWh
$5,044
-
kW-mo/yr
$894
-
lb
$25,500
TOTAL IMPLEMENTED $984 $3,740 $605
13,775
kWh
$379
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings