Assessment Year | 2000 |
---|---|
Principal Product | Automotive Fluids |
NAICS |
n/a
|
SIC | 2842: Specialty Cleaning, Polishing, and Sanitation Preparations |
Sales Range | $10 M to 50M |
# of Employees | 125 |
Plant Area |
210,000
ft2
|
Annual Production | 5,000,000
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $184,502 | 4,457,796 |
kWh
|
$0.041 |
Electricity Demand | $125,455 | 10,242 |
kW-mo/yr
|
$12.25 |
Electricity Fees | $43,980 | - |
|
- |
Natural Gas | $44,097 | 16,046 |
MMBtu
|
$2.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $46,259 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $984 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.431: Train operators for maximum operating efficiency | $25,500 | - | - | - | - | $25,500 | |
02 | 2.2621: Modify refrigeration system to operate at a lower pressure | $14,677 | $45,000 |
$11,145
254,982
kWh
|
$3,532
-
kW-mo/yr
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $3,555 | $1,380 |
$2,578
58,910
kWh
|
$977
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $984 | $3,740 |
$605
13,775
kWh
|
$379
-
kW-mo/yr
|
- | - | |
05 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $894 | - | - | - |
$894
-
lb
|
- | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $649 | - |
$493
11,137
kWh
|
$156
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $46,259 | $50,120 |
$14,821
338,804
kWh
|
$5,044
-
kW-mo/yr
|
$894
-
lb
|
$25,500 | ||
TOTAL IMPLEMENTED | $984 | $3,740 |
$605
13,775
kWh
|
$379
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs