ITAC Assessment: SU0567
ITAC logo
ITAC Assessment: SU0567
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Pressure sensitive labels, packaging films, and shrink sleeves
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 91
Plant Area 85,000
ft2
Annual Production 1,694,755,839
pieces
Production Hrs. Annual 4,160
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $111,066 2,158,581
kWh
Electricity Demand $114,571 7,119
kW-mo/yr
Electricity Fees $9,659 -
Natural Gas $17,780 3,028
MMBtu
Other Gas $1,121 1
MMBtu
Waste Disposal Costs
Water Usage $5,335 640,000
Tgal
TOTAL YEARLY COSTS $259,532
RECOMMENDED SAVINGS* $85,247 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 4.821: Pay bills on time to avoid late fees $557 - - - - $557
02 2.8121: Apply for tax-free status for energy purchases $14,493 $65 - - - $14,493
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,769 - - $5,769
-
kW-mo/yr
- -
04 2.4239: Eliminate or reduce compressed air usage $839 - $839
16,783
kWh
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $526 $117 $526
10,516
kWh
- - -
06 2.2437: Recover waste heat from equipment $712 $184 $499
9,983
kWh
- $212
-
MMBtu
-
07 2.7447: Install vinyl strip / high speed / air curtain doors $348 $229 - - $348
-
MMBtu
-
08 2.7447: Install vinyl strip / high speed / air curtain doors $230 $151 - - $230
-
MMBtu
-
09 2.4221: Install compressor air intakes in coolest locations $210 $362 $210
4,201
kWh
- - -
10 2.9114: Use solar heat to make electricty $61,563 $447,224 $61,563
1,207,122
kWh
- - -
TOTAL RECOMMENDED $85,247 $448,332 $63,637
1,248,605
kWh
$5,769
-
kW-mo/yr
$791
-
MMBtu
$15,050
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs