| Assessment Year | 2025 |
|---|---|
| Principal Product | Industrial Coated Fabrics |
| NAICS | 313320: Fabric Coating Mills |
| SIC | 2295: Coated Fabrics, Not Rubberized |
| Sales Range | $5 M to 10M |
| # of Employees | 46 |
| Plant Area |
72,500
ft2
|
| Annual Production | 1
units
|
| Production Hrs. Annual | 4,420
hrs
|
| Location (State) | Mississippi |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $170,940 | 1,406,400 |
kWh
|
$0.12 |
| Natural Gas | $83,230 | 5,564 |
MMBtu
|
$14.96 |
| TOTAL YEARLY COSTS | $254,170 | |||
| RECOMMENDED SAVINGS* | $99,863 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,870 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,596 | $135 |
$1,596
13,081
kWh
|
- | |
| 02 | 2.7135: Install occupancy sensors | $4,511 | $500 |
$4,511
36,978
kWh
|
- | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $427 | $50 |
$427
3,504
kWh
|
- | |
| 04 | 2.1116: Improve combustion control capability | $24,849 | $20,250 | - |
$24,849
-
MMBtu
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,396 | $9,990 |
$5,396
44,227
kWh
|
- | |
| 06 | 2.3513: Consider power loss as well as initial loads and load growth in down-sizing transformers | $3,451 | $15,964 |
$3,451
28,288
kWh
|
- | |
| 07 | 2.9114: Use solar heat to make electricty | $51,703 | $514,800 |
$51,703
423,797
kWh
|
- | |
| 08 | 2.7232: Replace existing hvac unit with high efficiency model | $7,930 | $80,003 |
$7,930
65,000
kWh
|
- | |
| TOTAL RECOMMENDED | $99,863 | $641,692 |
$75,014
614,875
kWh
|
$24,849
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $10,870 | $26,139 |
$10,870
89,100
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs