ITAC Assessment: OK0965
ITAC logo
ITAC Assessment: OK0965
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Wind turbine nacelle and hubs
NAICS 333611: Turbine and Turbine Generator Set Units Manufacturing
SIC 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units
Sales Range greater than $500
M
# of Employees 360
Plant Area 300,000
ft2
Annual Production 200
units
Production Hrs. Annual 5,148
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $214,689 4,906,500
kWh
Electricity Demand $285,946 12,985
kW-mo/yr
Electricity Fees $3,146 -
Natural Gas $36,990 4,919
MMBtu
TOTAL YEARLY COSTS $540,771
RECOMMENDED SAVINGS* $56,921 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,494

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $41,787 $55,459 $15,670
356,129
kWh
$26,117
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,915 $25,287 $6,915
157,154
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,316 $6,286 $281
6,378
kWh
$1,035
-
kW-mo/yr
-
04 2.7134: Use photocell controls $765 $3,975 $765
17,393
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $918 $3,250 $257
5,850
kWh
$661
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $858 $4,081 $858
19,504
kWh
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $500 $325 $500
11,373
kWh
- -
08 2.2437: Recover waste heat from equipment $353 $919 - - $353
-
MMBtu
09 2.4231: Reduce the pressure of compressed air to the minimum required $159 - $159
3,604
kWh
- -
10 2.7224: Reduce space conditioning during non-working hours $3,351 - $1,854
42,145
kWh
- $1,496
-
MMBtu
TOTAL RECOMMENDED $56,921 $99,582 $27,259
619,530
kWh
$27,813
-
kW-mo/yr
$1,849
-
MMBtu
TOTAL IMPLEMENTED $49,494 $73,376 $20,185
458,772
kWh
$27,813
-
kW-mo/yr
$1,496
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs