Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

251

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Soap and other detergents, except specialty cleaners
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0388 #08 Y:2014 Analyze flue gas for proper air/fuel ratio $272 $1,200
LE0388 #07 Y:2014 Use optimum size and capacity equipment $2,735 $9,703
LE0388 #06 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $5,432 $16,500
LE0388 #05 Y:2014 Utilize higher efficiency lamps and/or ballasts $8,333 $20,147
LE0388 #04 Y:2014 Reschedule plant operations or reduce load to avoid peaks $1,556 $3,052
LE0388 #03 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $510 $1,000
LE0388 #02 Y:2014 Use radiant heater for spot heating $11,147 $21,250
LE0388 #01 Y:2014 Recover waste heat from equipment $2,857 $1,520
LE0322 #04 Y:2011 Install occupancy sensors $188 $175
LE0322 #03 Y:2011 Utilize higher efficiency lamps and/or ballasts $781 $8,625
LE0322 #02 Y:2011 Use / purchase optimum sized compressor $3,000 $8,500
LE0322 #01 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $7,515 $1,000
MZ0003 #06 Y:2007 Add area lighting switches $3,995 $500
MZ0003 #05 Y:2007 Install occupancy sensors $5,992 $2,950
MZ0003 #04 Y:2007 Disconnect ballasts $45,032 $4,012
MZ0003 #03 Y:2007 Use waste heat from hot flue gases to preheat $23,859 $30,000
MZ0003 #02 Y:2007 Use adjustable frequency drive or multiple speed motors on existing system $56,702 $7,764
MZ0003 #01 Y:2007 Replace boiler $237,208 $220,000
AM0521 #11 Y:2006 Insulate bare equipment $180 $150
AM0521 #10 Y:2006 Optimize plant power factor $900 $1,620