251
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Soap and other detergents, except specialty cleaners | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LE0388 #08 Y:2014 | 08 | 2014 | Analyze flue gas for proper air/fuel ratio | $272 | $1,200 | |
| LE0388 #07 Y:2014 | 07 | 2014 | Use optimum size and capacity equipment | $2,735 | $9,703 | |
| LE0388 #06 Y:2014 | 06 | 2014 | Use adjustable frequency drive or multiple speed motors on existing system | $5,432 | $16,500 | |
| LE0388 #05 Y:2014 | 05 | 2014 | Utilize higher efficiency lamps and/or ballasts | $8,333 | $20,147 | |
| LE0388 #04 Y:2014 | 04 | 2014 | Reschedule plant operations or reduce load to avoid peaks | $1,556 | $3,052 | |
| LE0388 #03 Y:2014 | 03 | 2014 | Eliminate leaks in inert gas and compressed air lines/ valves | $510 | $1,000 | |
| LE0388 #02 Y:2014 | 02 | 2014 | Use radiant heater for spot heating | $11,147 | $21,250 | |
| LE0388 #01 Y:2014 | 01 | 2014 | Recover waste heat from equipment | $2,857 | $1,520 | |
| LE0322 #04 Y:2011 | 04 | 2011 | Install occupancy sensors | $188 | $175 | |
| LE0322 #03 Y:2011 | 03 | 2011 | Utilize higher efficiency lamps and/or ballasts | $781 | $8,625 | |
| LE0322 #02 Y:2011 | 02 | 2011 | Use / purchase optimum sized compressor | $3,000 | $8,500 | |
| LE0322 #01 Y:2011 | 01 | 2011 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,515 | $1,000 | |
| MZ0003 #06 Y:2007 | 06 | 2007 | Add area lighting switches | $3,995 | $500 | |
| MZ0003 #05 Y:2007 | 05 | 2007 | Install occupancy sensors | $5,992 | $2,950 | |
| MZ0003 #04 Y:2007 | 04 | 2007 | Disconnect ballasts | $45,032 | $4,012 | |
| MZ0003 #03 Y:2007 | 03 | 2007 | Use waste heat from hot flue gases to preheat | $23,859 | $30,000 | |
| MZ0003 #02 Y:2007 | 02 | 2007 | Use adjustable frequency drive or multiple speed motors on existing system | $56,702 | $7,764 | |
| MZ0003 #01 Y:2007 | 01 | 2007 | Replace boiler | $237,208 | $220,000 | |
| AM0521 #11 Y:2006 | 11 | 2006 | Insulate bare equipment | $180 | $150 | |
| AM0521 #10 Y:2006 | 10 | 2006 | Optimize plant power factor | $900 | $1,620 |