Assessment Year | 2015 |
---|---|
Principal Product | Detergents |
NAICS | 325611: Soap and Other Detergent Manufacturing |
SIC | 2841: Soap and Other Detergents, Except Specialty Cleaners |
Sales Range | $10 M to 50M |
# of Employees | 48 |
Plant Area |
90,000
ft2
|
Annual Production | 4,510
Tgal
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $98,286 | 437,440 |
kWh
|
$0.22 |
Electricity Demand | $31,119 | 1,813 |
kW-mo/yr
|
$17.16 |
Electricity Fees | $371 | - |
|
- |
Natural Gas | $52,326 | 5,967 |
MMBtu
|
$8.77 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,842 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,972 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $2,857 | $1,520 | - | - |
$2,857
-
MMBtu
|
|
02 | 2.7231: Use radiant heater for spot heating | $11,147 | $21,250 | - | - |
$11,147
-
MMBtu
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $510 | $1,000 |
$263
1,169
kWh
|
$247
-
kW-mo/yr
|
- | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,556 | $3,052 | - |
$1,556
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,333 | $20,147 |
$6,163
27,391
kWh
|
$2,170
-
kW-mo/yr
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,432 | $16,500 |
$4,017
17,851
kWh
|
$1,415
-
kW-mo/yr
|
- | |
07 | 2.4323: Use optimum size and capacity equipment | $2,735 | $9,703 |
$2,503
11,124
kWh
|
$232
-
kW-mo/yr
|
- | |
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $272 | $1,200 | - | - |
$272
-
MMBtu
|
|
TOTAL RECOMMENDED | $32,842 | $74,372 |
$12,946
57,535
kWh
|
$5,620
-
kW-mo/yr
|
$14,276
-
MMBtu
|
||
TOTAL IMPLEMENTED | $11,972 | $23,867 |
$6,426
28,560
kWh
|
$2,417
-
kW-mo/yr
|
$3,129
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs