ITAC Assessment: LE0388
ITAC logo
ITAC Assessment: LE0388
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Detergents
NAICS 325611: Soap and Other Detergent Manufacturing
SIC 2841: Soap and Other Detergents, Except Specialty Cleaners
Sales Range $10
M
to 50
M
# of Employees 48
Plant Area 90,000
ft2
Annual Production 4,510
Tgal
Production Hrs. Annual 2,080
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,286 437,440
kWh
Electricity Demand $31,119 1,813
kW-mo/yr
Electricity Fees $371 -
Natural Gas $52,326 5,967
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,842 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,972

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $2,857 $1,520 - - $2,857
-
MMBtu
02 2.7231: Use radiant heater for spot heating $11,147 $21,250 - - $11,147
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $510 $1,000 $263
1,169
kWh
$247
-
kW-mo/yr
-
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,556 $3,052 - $1,556
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $8,333 $20,147 $6,163
27,391
kWh
$2,170
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,432 $16,500 $4,017
17,851
kWh
$1,415
-
kW-mo/yr
-
07 2.4323: Use optimum size and capacity equipment $2,735 $9,703 $2,503
11,124
kWh
$232
-
kW-mo/yr
-
08 2.1233: Analyze flue gas for proper air/fuel ratio $272 $1,200 - - $272
-
MMBtu
TOTAL RECOMMENDED $32,842 $74,372 $12,946
57,535
kWh
$5,620
-
kW-mo/yr
$14,276
-
MMBtu
TOTAL IMPLEMENTED $11,972 $23,867 $6,426
28,560
kWh
$2,417
-
kW-mo/yr
$3,129
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs