184
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Biological products, except diagnostic substances | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
SD0665 #06 Y:2024 | 06 | 2024 | Replace existing chiller with high efficiency model | $74,386 | $209,425 |
n/a
|
SD0665 #05 Y:2024 | 05 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $3,342 | $2,233 |
n/a
|
SD0665 #04 Y:2024 | 04 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $58,983 | $101,750 |
n/a
|
SD0665 #03 Y:2024 | 03 | 2024 | Adopt in-house material generation | $23,739 | $46,406 |
n/a
|
SD0665 #02 Y:2024 | 02 | 2024 | Use battery storage for demand control | $203,574 | $5,892 |
n/a
|
SD0665 #01 Y:2024 | 01 | 2024 | Use solar heat to make electricty | $614,791 | $395,505 |
n/a
|
SD0629 #05 Y:2022 | 05 | 2022 | Lower temperature during the winter season and vice-versa | $1,948 | $100 | |
SD0629 #04 Y:2022 | 04 | 2022 | Use photocell controls | $888 | $1,680 | |
SD0629 #03 Y:2022 | 03 | 2022 | Use adjustable frequency drive or multiple speed motors on existing system | $5,538 | $10,551 | |
SD0629 #02 Y:2022 | 02 | 2022 | Use solar heat to make electricty | $64,030 | $201,231 | |
SD0629 #01 Y:2022 | 01 | 2022 | Utilize higher efficiency lamps and/or ballasts | $974 | $1,320 | |
SD0626 #06 Y:2022 | 06 | 2022 | Modify startup/shutdown times | $87,191 | $2,500 | |
SD0626 #05 Y:2022 | 05 | 2022 | Modify startup/shutdown times | $90,974 | $2,500 | |
SD0626 #04 Y:2022 | 04 | 2022 | Use adjustable frequency drive or multiple speed motors on existing system | $1,642 | $5,868 | |
SD0626 #03 Y:2022 | 03 | 2022 | Utilize higher efficiency lamps and/or ballasts | $3,114 | $4,352 | |
SD0626 #02 Y:2022 | 02 | 2022 | Use adjustable frequency drive or multiple speed motors on existing system | $1,022 | $3,456 | |
SD0626 #01 Y:2022 | 01 | 2022 | Use solar heat to make electricty | $54,888 | $228,599 | |
SD0625 #05 Y:2022 | 05 | 2022 | Use waste heat from hot flue gases to preheat | $2,482 | $5,000 | |
SD0625 #04 Y:2022 | 04 | 2022 | Minimize condenser cooling water temperature | $8,765 | $13,961 | |
SD0625 #03 Y:2022 | 03 | 2022 | Upgrade controls on compressors | $348 | $1,355 |