ITAC Assessment: SD0665
ITAC logo
ITAC Assessment: SD0665
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Bioreactors
NAICS 325414: Biological Product (except Diagnostic) Manufacturing
SIC 2836: Biological Products, Except Diagnostic Substances
Sales Range $100
M
to 500
M
# of Employees 150
Plant Area 240,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 5,633
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $879,531 2,906,458
kWh
Electricity Demand $364,831 3,743
kW-mo/yr
Electricity Fees $506,749 -
Natural Gas $26,051 3,483
MMBtu
Other Gas $32,640 1
MMBtu
TOTAL YEARLY COSTS $1,809,802
RECOMMENDED SAVINGS* $978,814 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
01 2.9114: Use solar heat to make electricty $614,791 $395,505 $260,039
859,350
kWh
$354,752
-
kW-mo/yr
- -
02 2.3141: Use battery storage for demand control $203,574 $5,892 $(-19,101.9)
(-63,126)
kWh
$222,676
-
kW-mo/yr
- -
03 4.212: Adopt in-house material generation $23,739 $46,406 $(-8,901.0)
(-29,416)
kWh
- - $32,640
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $58,983 $101,750 $35,500
117,163
kWh
$6,892
-
kW-mo/yr
$16,591
-
MMBtu
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,342 $2,233 $1,799
5,944
kWh
$1,543
-
kW-mo/yr
- -
06 2.2622: Replace existing chiller with high efficiency model $74,386 $209,425 $74,386
245,821
kWh
- - -
TOTAL RECOMMENDED $978,814 $761,211 $343,720
1,135,736
kWh
$585,863
-
kW-mo/yr
$16,591
-
MMBtu
$32,640
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs