ITAC Assessment: SD0629
ITAC logo
ITAC Assessment: SD0629
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Processed Plasma
NAICS 325414: Biological Product (except Diagnostic) Manufacturing
SIC 2836: Biological Products, Except Diagnostic Substances
Sales Range $50
M
to 100
M
# of Employees 53
Plant Area 31,154
ft2
Annual Production 50,000
units
Production Hrs. Annual 2,250
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $417,212 1,656,266
kWh
Electricity Demand $95,717 5,844
kW-mo/yr
Natural Gas $647 35
MMBtu
TOTAL YEARLY COSTS $513,576
RECOMMENDED SAVINGS* $73,378 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $974 $1,320 $714
2,835
kWh
$248
-
kW-mo/yr
$12
02 2.9114: Use solar heat to make electricty $64,030 $201,231 $47,437
188,318
kWh
$16,593
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,538 $10,551 $4,938
19,604
kWh
$600
-
kW-mo/yr
-
04 2.7134: Use photocell controls $888 $1,680 $888
3,528
kWh
- -
05 2.7221: Lower temperature during the winter season and vice-versa $1,948 $100 $1,653
6,563
kWh
$295
-
kW-mo/yr
-
TOTAL RECOMMENDED $73,378 $214,882 $55,630
220,848
kWh
$17,736
-
kW-mo/yr
$12
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs