ITAC Assessment: OK0867
ITAC logo
ITAC Assessment: OK0867
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Traffic Signal Hardware, Utility Products, Decorative Outdoor Lighting
NAICS 332510: Hardware Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 120,000
ft2
Annual Production 633,336
units
Production Hrs. Annual 2,288
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,563 1,074,860
kWh
Electricity Demand $19,778 2,258
kW-mo/yr
Natural Gas $30,702 6,758
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,425 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,117

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7241: Install outside air damper / economizer on hvac unit $8,579 $6,400 $8,579
153,204
kWh
- -
02 2.7211: Clean and maintain refrigerant condensers and towers $1,208 $3,900 $621
10,372
kWh
$587
-
kW-mo/yr
-
03 2.6232: Install set-back timers $3,386 $894 $1,181
19,719
kWh
- $2,205
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,837 $21,300 $3,598
64,241
kWh
$2,239
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,294 $2,444 $958
9,576
kWh
$336
-
kW-mo/yr
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,712 $500 $1,712
24,223
kWh
- -
07 2.2437: Recover waste heat from equipment $747 $1,909 - - $747
-
MMBtu
08 2.4322: Use or replace with energy efficient substitutes $346 $701 $346
3,459
kWh
- -
09 2.4322: Use or replace with energy efficient substitutes $2,228 $4,333 $2,228
22,283
kWh
- -
10 2.4322: Use or replace with energy efficient substitutes $74 - $74
1,325
kWh
- -
11 2.2511: Insulate bare equipment $15 $44 - - $15
-
MMBtu
TOTAL RECOMMENDED $25,425 $42,425 $19,296
308,402
kWh
$3,162
-
kW-mo/yr
$2,967
-
MMBtu
TOTAL IMPLEMENTED $9,117 $26,445 $6,276
102,295
kWh
$2,826
-
kW-mo/yr
$15
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs