Assessment Year | 2001 |
---|---|
Principal Product | Asphalt |
NAICS |
n/a
|
SIC | 2951: Asphalt Paving Mixtures and Blocks |
Sales Range | $5 M to 10M |
# of Employees | 7 |
Plant Area |
108,900
ft2
|
Annual Production | 252,000
ton
|
Production Hrs. Annual | 3,840
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $21,063 | 545,920 |
kWh
|
$0.039 |
Electricity Demand | $56,771 | 450 |
kW-mo/yr
|
$126.16 |
Natural Gas | $333,276 | 58,494 |
MMBtu
|
$5.70 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $129,855 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $86,863 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $167 | $136 | - | - |
$167
-
MMBtu
|
- | - | |
02 | 2.2437: Recover waste heat from equipment | $22,605 | $175,000 |
$9,223
239,088
kWh
|
$13,382
-
kW-mo/yr
|
- | - | - | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $14,413 | $1,000 | - | - |
$14,413
-
MMBtu
|
- | - | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $11,970 | $4,460 | - | - |
$11,970
-
MMBtu
|
- | - | |
05 | 2.4157: Establish a predictive maintenance program | $15,557 | $1,500 |
$6,321
163,787
kWh
|
$9,236
-
kW-mo/yr
|
- | - | - | |
06 | 2.2628: Utilize a less expensive cooling method | $99 | $80 |
$45
1,172
kWh
|
$54
-
kW-mo/yr
|
- | - | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,354 | $75 |
$645
16,701
kWh
|
$709
-
kW-mo/yr
|
- | - | - | |
08 | 3.6124: Burn waste oil for heat | $55,440 | $10,000 | - | - | - |
$55,440
-
gal
|
- | |
09 | 4.232: Lease equipment instead of purchasing | $2,250 | $200 | - | - | - | - | $2,250 | |
10 | 4.521: Clear and rent existing space | $6,000 | $500 | - | - | - | - | $6,000 | |
TOTAL RECOMMENDED | $129,855 | $192,951 |
$16,234
420,748
kWh
|
$23,381
-
kW-mo/yr
|
$26,550
-
MMBtu
|
$55,440
-
gal
|
$8,250 | ||
TOTAL IMPLEMENTED | $86,863 | $12,655 |
$7,011
181,660
kWh
|
$9,999
-
kW-mo/yr
|
$14,413
-
MMBtu
|
$55,440
-
gal
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs