ITAC Assessment: WV0216
ITAC logo
ITAC Assessment: WV0216
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Asphalt
NAICS
n/a
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $5
M
to 10
M
# of Employees 7
Plant Area 108,900
ft2
Annual Production 252,000
ton
Production Hrs. Annual 3,840
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,063 545,920
kWh
Electricity Demand $56,771 450
kW-mo/yr
Natural Gas $333,276 58,494
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $129,855 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $86,863

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
01 2.2437: Recover waste heat from equipment $167 $136 - - $167
-
MMBtu
- -
02 2.2437: Recover waste heat from equipment $22,605 $175,000 $9,223
239,088
kWh
$13,382
-
kW-mo/yr
- - -
03 2.1233: Analyze flue gas for proper air/fuel ratio $14,413 $1,000 - - $14,413
-
MMBtu
- -
04 2.2414: Use waste heat from hot flue gases to preheat $11,970 $4,460 - - $11,970
-
MMBtu
- -
05 2.4157: Establish a predictive maintenance program $15,557 $1,500 $6,321
163,787
kWh
$9,236
-
kW-mo/yr
- - -
06 2.2628: Utilize a less expensive cooling method $99 $80 $45
1,172
kWh
$54
-
kW-mo/yr
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,354 $75 $645
16,701
kWh
$709
-
kW-mo/yr
- - -
08 3.6124: Burn waste oil for heat $55,440 $10,000 - - - $55,440
-
gal
-
09 4.232: Lease equipment instead of purchasing $2,250 $200 - - - - $2,250
10 4.521: Clear and rent existing space $6,000 $500 - - - - $6,000
TOTAL RECOMMENDED $129,855 $192,951 $16,234
420,748
kWh
$23,381
-
kW-mo/yr
$26,550
-
MMBtu
$55,440
-
gal
$8,250
TOTAL IMPLEMENTED $86,863 $12,655 $7,011
181,660
kWh
$9,999
-
kW-mo/yr
$14,413
-
MMBtu
$55,440
-
gal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs