ITAC Assessment: SD0625
ITAC logo
ITAC Assessment: SD0625
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Antibodies, Cell Therapies
NAICS 325414: Biological Product (except Diagnostic) Manufacturing
SIC 2836: Biological Products, Except Diagnostic Substances
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 42,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 2,295
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $241,273 1,863,698
kWh
Electricity Demand $237,440 8,584
kW-mo/yr
Natural Gas $83,581 6,230
MMBtu
Waste Disposal Costs
Water Usage $4,308 504,000
Tgal
TOTAL YEARLY COSTS $566,602
RECOMMENDED SAVINGS* $112,789 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $100,326 $408,646 $46,694
360,570
kWh
$53,632
-
kW-mo/yr
-
02 2.2441: Preheat boiler makeup water with waste process heat $868 $4,212 - - $868
-
MMBtu
03 2.4224: Upgrade controls on compressors $348 $1,355 $348
2,687
kWh
- -
04 2.2623: Minimize condenser cooling water temperature $8,765 $13,961 $4,146
32,015
kWh
$4,619
-
kW-mo/yr
-
05 2.2414: Use waste heat from hot flue gases to preheat $2,482 $5,000 - - $2,482
-
MMBtu
TOTAL RECOMMENDED $112,789 $433,174 $51,188
395,272
kWh
$58,251
-
kW-mo/yr
$3,350
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs