ITAC Assessment: KU0079
ITAC logo
ITAC Assessment: KU0079
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product NEWSPAPERS
NAICS
n/a
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $1
M
to 5
M
# of Employees 80
Plant Area
n/a
Annual Production 10,000,000
pieces
Production Hrs. Annual 3,807
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,796 449,004
kWh
Natural Gas $6,039 1,519
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,045 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,107

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $4,862 - $3,520
45,428
kWh
$1,342
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,477 $1,800 $1,477
19,050
kWh
-
03 2.4312: Improve lubrication practices $1,453 $300 $1,453
18,757
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $520 $350 - $520
-
MMBtu
05 2.1123: Install automatic stack damper $417 $275 - $417
-
MMBtu
06 2.3212: Optimize plant power factor $376 $425 $376
-
kWh
-
07 2.7447: Install vinyl strip / high speed / air curtain doors $250 $220 - $250
-
MMBtu
08 2.1123: Install automatic stack damper $67 $90 - $67
-
MMBtu
09 2.2121: Increase amount of condensate returned $623 - - $623
-
MMBtu
TOTAL RECOMMENDED $10,045 $3,460 $6,826
83,235
kWh
$3,219
-
MMBtu
TOTAL IMPLEMENTED $1,107 $365 - $1,107
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs