ITAC Assessment: SD0626
ITAC logo
ITAC Assessment: SD0626
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Antibodies, Cell Therapies
NAICS 325414: Biological Product (except Diagnostic) Manufacturing
SIC 2836: Biological Products, Except Diagnostic Substances
Sales Range $10
M
to 50
M
# of Employees 241
Plant Area 115,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 2,295
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $636,314 5,375,675
kWh
Electricity Demand $606,729 22,558
kW-mo/yr
Electricity Fees $(-4,214.0) -
Natural Gas $277,087 21,391
MMBtu
TOTAL YEARLY COSTS $1,515,916
RECOMMENDED SAVINGS* $238,831 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $54,888 $228,599 $22,087
201,705
kWh
$32,801
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,022 $3,456 $464
3,442
kWh
$558
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,114 $4,352 $1,470
13,421
kWh
$1,614
-
kW-mo/yr
$30 -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,642 $5,868 $752
6,163
kWh
$890
-
kW-mo/yr
- -
05 4.454: Modify startup/shutdown times $90,974 $2,500 $90,974
534,161
kWh
- - -
06 4.454: Modify startup/shutdown times $87,191 $2,500 - - - $87,191
-
MMBtu
TOTAL RECOMMENDED $238,831 $247,275 $115,747
758,892
kWh
$35,863
-
kW-mo/yr
$30 $87,191
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs