Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,213

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Pharmaceutical preparations
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0224 #11 Y:2001 Install occupancy sensors $17,495 $33,556
SF0224 #10 Y:2001 Add equipment/ operators to reduce production bottleneck $259,156 $256,500
SF0224 #09 Y:2001 Use most efficient type of electric motors $6,142 $6,113
SF0224 #08 Y:2001 Install timers on light switches in little used areas $11,660 $9,500
SF0224 #07 Y:2001 Analyze flue gas for proper air/fuel ratio $25,962 $13,200
SF0224 #06 Y:2001 Install compressor air intakes in coolest locations $6,146 $2,800
SF0224 #05 Y:2001 Install timers on light switches in little used areas $10,562 $3,240
SF0224 #04 Y:2001 Use insulation in furnaces to facilitate heating / cooling $18,526 $4,994
SF0224 #03 Y:2001 Close off unneeded steam lines $2,618 $172
SF0224 #02 Y:2001 Establish burner maintenance schedule for boilers $1,556 -
SF0224 #01 Y:2001 Install occupancy sensors $9,345 $540
UM0190 #06 Y:2001 Install compressor air intakes in coolest locations $5,684 $1,000
UM0190 #05 Y:2001 Optimize plant power factor $20,286 $8,250
UM0190 #04 Y:2001 Make ice during off peak hours for cooling $293,000 $360,000
UM0190 #03 Y:2001 Lower temperature during the winter season and vice-versa $82,700 $8,000
UM0190 #02 Y:2001 Install occupancy sensors $20,468 $9,600
UM0190 #01 Y:2001 Utilize higher efficiency lamps and/or ballasts $81,576 $80,632
OK0617 #07 Y:2001 Recover waste heat from equipment $23,985 $27,632
OK0617 #06 Y:2001 Install equipment to move product $1,170 $1,000
OK0617 #05 Y:2001 Use adjustable frequency drive or multiple speed motors on existing system $8,337 $9,259