ITAC Assessment: NC0228
ITAC logo
ITAC Assessment: NC0228
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Blood components
NAICS
n/a
SIC 2834: Pharmaceutical Preparations
Sales Range greater than $500
M
# of Employees 2,000
Plant Area 1,000,000
ft2
Annual Production 582
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,828,104 76,860,494
kWh
Electricity Demand $1,716,603 105,241
kW-mo/yr
Electricity Fees $9,637 -
Natural Gas $1,107,284 267,966
MMBtu
Fuel Oil #2 $133,584 18,521
MMBtu
Fuel Oil #4 $215,982 40,960
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $598,823 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings Increase in Production Savings
01 4.125: $296,000 $75,000 n/a - - - - $(-4,000.0) $300,000
02 2.4227: Use compressor air filters $41,667 $10,600 n/a - - - - $41,667 -
03 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation $173,756 $88,000 n/a $45,991
1,690,348
kWh
$29,100
-
kW-mo/yr
$98,665
-
MMBtu
- - -
04 2.5194: Redesign process $74,974 $100,000 n/a $(-53,178.0)
(-1,969,561)
kWh
$(-40,546.0)
-
kW-mo/yr
- $(-29,315.0)
-
Tgal
$198,013 -
05 3.3128: Utilize other methods to remove contaminants $12,426 $39,808 n/a $(-388.0)
(-14,379)
kWh
$(-296.0)
-
kW-mo/yr
- $1,757
-
Tgal
$11,353 -
TOTAL RECOMMENDED $598,823 $313,408 $(-7,575.0)
(-293,592)
kWh
$(-11,742.0)
-
kW-mo/yr
$98,665
-
MMBtu
$(-27,558.0)
-
Tgal
$247,033 $300,000
TOTAL IMPLEMENTED - - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs