Assessment Year | 2002 |
---|---|
Principal Product | Blood components |
NAICS |
n/a
|
SIC | 2834: Pharmaceutical Preparations |
Sales Range | greater than $500 M |
# of Employees | 2,000 |
Plant Area |
1,000,000
ft2
|
Annual Production | 582
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $3,828,104 | 76,860,494 |
kWh
|
$0.050 |
Electricity Demand | $1,716,603 | 105,241 |
kW-mo/yr
|
$16.31 |
Electricity Fees | $9,637 | - |
|
- |
Natural Gas | $1,107,284 | 267,966 |
MMBtu
|
$4.13 |
Fuel Oil #2 | $133,584 | 18,521 |
MMBtu
|
$7.21 |
Fuel Oil #4 | $215,982 | 40,960 |
MMBtu
|
$5.27 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $598,823 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 4.125: | $296,000 | $75,000 | n/a | - | - | - | - | $(-4,000.0) | $300,000 |
02 | 2.4227: Use compressor air filters | $41,667 | $10,600 | n/a | - | - | - | - | $41,667 | - |
03 | 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation | $173,756 | $88,000 | n/a |
$45,991
1,690,348
kWh
|
$29,100
-
kW-mo/yr
|
$98,665
-
MMBtu
|
- | - | - |
04 | 2.5194: Redesign process | $74,974 | $100,000 | n/a |
$(-53,178.0)
(-1,969,561)
kWh
|
$(-40,546.0)
-
kW-mo/yr
|
- |
$(-29,315.0)
-
Tgal
|
$198,013 | - |
05 | 3.3128: Utilize other methods to remove contaminants | $12,426 | $39,808 | n/a |
$(-388.0)
(-14,379)
kWh
|
$(-296.0)
-
kW-mo/yr
|
- |
$1,757
-
Tgal
|
$11,353 | - |
TOTAL RECOMMENDED | $598,823 | $313,408 |
$(-7,575.0)
(-293,592)
kWh
|
$(-11,742.0)
-
kW-mo/yr
|
$98,665
-
MMBtu
|
$(-27,558.0)
-
Tgal
|
$247,033 | $300,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs