ITAC Assessment: SU0155
ITAC logo
ITAC Assessment: SU0155
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product textile identification systems
NAICS 333244: Printing Machinery and Equipment Manufacturing
SIC 3953: Marking Devices
Sales Range $10
M
to 50
M
# of Employees 94
Plant Area 42,270
ft2
Annual Production 1,800
pieces
Production Hrs. Annual 2,080
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,936 582,643
kWh
Electricity Demand $49,215 3,672
kW-mo/yr
Natural Gas $21,125 2,694
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,657 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,321

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 4.513: Re-arrange equipment layout to reduce labor costs $20,634 $768 - - - - $20,634
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $17,787 $1,200 - $17,787
-
kW-mo/yr
- - -
03 2.7444: Close holes and openings in building such as broken windows $4,200 $8,636 - - $4,200
-
MMBtu
- -
04 3.1191: Change procedures / equipment / operating conditions $4,056 - - - - - $4,056
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $4,016 - - - - $4,016
-
lb
-
06 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $2,195 $4,877 - - $2,195
-
MMBtu
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,755 $320 $1,755
25,808
kWh
- - - -
08 2.2437: Recover waste heat from equipment $1,406 $420 - - $1,406
-
MMBtu
- -
09 2.7447: Install vinyl strip / high speed / air curtain doors $901 $1,660 - - $901
-
MMBtu
- -
10 2.1233: Analyze flue gas for proper air/fuel ratio $381 $500 - - $381
-
MMBtu
- -
11 2.7124: Make a practice of turning off lights when not needed $326 - $326
4,792
kWh
- - - -
TOTAL RECOMMENDED $57,657 $18,381 $2,081
30,600
kWh
$17,787
-
kW-mo/yr
$9,083
-
MMBtu
$4,016
-
lb
$24,690
TOTAL IMPLEMENTED $28,321 $2,020 $2,081
30,600
kWh
$17,787
-
kW-mo/yr
$381
-
MMBtu
$4,016
-
lb
$4,056
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs