| Assessment Year | 1989 |
|---|---|
| Principal Product | ANIMAL HEALTH PRODUCTS |
| NAICS |
n/a
|
| SIC | 2836: Biological Products, Except Diagnostic Substances |
| Sales Range | $10 M to 50M |
| # of Employees | 335 |
| Plant Area |
n/a
|
| Annual Production | 9,500,000
pieces
|
| Production Hrs. Annual | 2,500
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $250,737 | 5,254,103 |
kWh
|
$0.048 |
| Natural Gas | $165,922 | 48,986 |
MMBtu
|
$3.39 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $46,426 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $46,426 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2621: Modify refrigeration system to operate at a lower pressure | $25,620 | $38,400 |
$25,620
536,928
kWh
|
- | - | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $10,343 | $1,400 | - |
$10,343
-
MMBtu
|
- | |
| 03 | 2.1222: Install turbulators | $5,599 | $5,760 | - |
$5,599
-
MMBtu
|
- | |
| 04 | 2.1232: Keep boiler tubes clean | $3,005 | $1,500 | - |
$4,005
-
MMBtu
|
$(-1,000.0) | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,859 | $2,558 |
$1,859
38,980
kWh
|
- | - | |
| TOTAL RECOMMENDED | $46,426 | $49,618 |
$27,479
575,908
kWh
|
$19,947
-
MMBtu
|
$(-1,000.0) | ||
| TOTAL IMPLEMENTED | $46,426 | $49,618 |
$27,479
575,908
kWh
|
$19,947
-
MMBtu
|
$(-1,000.0) | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs