ITAC Assessment: KU0273
ITAC logo
ITAC Assessment: KU0273
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product ANIMAL HEALTH PRODUCTS
NAICS
n/a
SIC 2836: Biological Products, Except Diagnostic Substances
Sales Range $10
M
to 50
M
# of Employees 335
Plant Area
n/a
Annual Production 9,500,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $250,737 5,254,103
kWh
Natural Gas $165,922 48,986
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,426 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,426

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $25,620 $38,400 $25,620
536,928
kWh
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $10,343 $1,400 - $10,343
-
MMBtu
-
03 2.1222: Install turbulators $5,599 $5,760 - $5,599
-
MMBtu
-
04 2.1232: Keep boiler tubes clean $3,005 $1,500 - $4,005
-
MMBtu
$(-1,000.0)
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,859 $2,558 $1,859
38,980
kWh
- -
TOTAL RECOMMENDED $46,426 $49,618 $27,479
575,908
kWh
$19,947
-
MMBtu
$(-1,000.0)
TOTAL IMPLEMENTED $46,426 $49,618 $27,479
575,908
kWh
$19,947
-
MMBtu
$(-1,000.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs