ITAC Assessment: UL0176
ITAC logo
ITAC Assessment: UL0176
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Letterpress and Lithographic Printing
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 69,790
ft2
Annual Production 0
pieces
Production Hrs. Annual 7,776
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,459 3,606,682
kWh
Electricity Demand $73,434 7,638
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $422,588 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $802

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $802 $1,661 $444
16,413
kWh
$358
-
kW-mo/yr
- - - - -
02 2.4133: Use most efficient type of electric motors $136 $3,180 $88
3,224
kWh
$48
-
kW-mo/yr
- - - - -
03 3.5121: Recycle waste ink and cleanup solvent $45,321 - - - $3,640
-
gal
- - $41,681 -
04 4.231: Purchase equipment instead of leasing $11,180 $4,500 - - - - $11,180 - -
05 4.211: Consider use / purchase of bulk materials where possible $9,373 $400 - - - $373
-
lb
- $9,000 -
06 4.514: Re-arrange equipment layout to reduce handling costs $355,776 $77,600 - - - - - - $355,776
TOTAL RECOMMENDED $422,588 $87,341 $532
19,637
kWh
$406
-
kW-mo/yr
$3,640
-
gal
$373
-
lb
$11,180 $50,681 $355,776
TOTAL IMPLEMENTED $802 $1,661 $444
16,413
kWh
$358
-
kW-mo/yr
- - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs