ITAC Assessment: SF0224
ITAC logo
ITAC Assessment: SF0224
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Unit Dose inhalation solution
NAICS
n/a
SIC 2834: Pharmaceutical Preparations
Sales Range $100
M
to 500
M
# of Employees 869
Plant Area 345,000
ft2
Annual Production 677,000,000
units
Production Hrs. Annual 8,568
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,264,926 14,860,503
kWh
Natural Gas $246,694 39,282
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $489,326 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7135: Install occupancy sensors $9,345 $540 n/a $9,345
112,455
kWh
- -
02 2.1231: Establish burner maintenance schedule for boilers $1,556 - n/a - $1,556
-
MMBtu
-
03 2.2153: Close off unneeded steam lines $2,618 $172 n/a $2,618
20,228
kWh
- -
04 2.1121: Use insulation in furnaces to facilitate heating / cooling $18,526 $4,994 n/a $18,526
143,170
kWh
- -
05 2.7132: Install timers on light switches in little used areas $10,562 $3,240 n/a $10,562
81,625
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $6,146 $2,800 n/a $6,146
47,496
kWh
- -
07 2.1233: Analyze flue gas for proper air/fuel ratio $25,962 $13,200 n/a - $25,962
-
MMBtu
-
08 2.7132: Install timers on light switches in little used areas $11,660 $9,500 n/a $11,660
90,105
kWh
- -
09 2.4133: Use most efficient type of electric motors $6,142 $6,113 n/a $6,142
86,512
kWh
- -
10 4.111: Add equipment/ operators to reduce production bottleneck $259,156 $256,500 n/a $259,156
10,546,893
kWh
- -
11 2.7135: Install occupancy sensors $17,495 $33,556 n/a $17,495
282,373
kWh
- -
12 2.3212: Optimize plant power factor $120,158 $160,000 n/a - - $120,158
TOTAL RECOMMENDED $489,326 $490,615 $341,650
11,410,857
kWh
$27,518
-
MMBtu
$120,158
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs