ITAC Assessment: BD0023
ITAC logo
ITAC Assessment: BD0023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Custom Machinery
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area 85,000
ft2
Annual Production 25
ton
Production Hrs. Annual 5,460
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,773 2,147,128
kWh
Natural Gas $15,139 3,221
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,777 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,822

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,980 $500 $1,980
31,946
kWh
-
02 2.7111: Reduce illumination to minimum necessary levels $807 $600 $807
13,189
kWh
-
03 2.7135: Install occupancy sensors $1,215 $150 $1,215
19,637
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $801 $20 $801
12,896
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $534 $6,380 $534
8,792
kWh
-
06 2.4133: Use most efficient type of electric motors $3,132 $64 $3,132
50,703
kWh
-
07 2.6214: Shut off pilots in standby equipment $308 - - $308
-
MMBtu
TOTAL RECOMMENDED $8,777 $7,714 $8,469
137,163
kWh
$308
-
MMBtu
TOTAL IMPLEMENTED $2,822 $6,880 $2,514
40,738
kWh
$308
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings