Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,213

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Pharmaceutical preparations
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0056 #03 Y:2003 Use or replace with energy efficient substitutes $1,817 $4,301
MI0056 #02 Y:2003 Add equipment/ operators to reduce production bottleneck $281,112 $88,736
MI0056 #01 Y:2003 Change rate schedules or other changes in utility service $180,266 $2,000
IC0059 #08 Y:2003 Improve air circulation with destratification fans / other methods $15,906 $39,257
IC0059 #07 Y:2003 Install occupancy sensors $6,054 $12,848
IC0059 #06 Y:2003 Utilize higher efficiency lamps and/or ballasts $22,696 $89,463
IC0059 #05 Y:2003 Install / repair insulation on steam lines $446 $792
IC0059 #04 Y:2003 Install / repair insulation on steam lines $2,181 $1,832
IC0059 #03 Y:2003 Use most efficient type of electric motors $3,765 $1,840
IC0059 #02 Y:2003 Install compressor air intakes in coolest locations $1,075 $3,136
IC0059 #01 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $7,384 $3,000
MI0055 #09 Y:2003 Install vinyl strip / high speed / air curtain doors $4,438 $4,636
MI0055 #08 Y:2003 Modify storage space to avoid rental of a warehouse $2,584 $3,000
MI0055 #07 Y:2003 Use adjustable frequency drive or multiple speed motors on existing system $3,020 $3,085
MI0055 #06 Y:2003 Use adjustable frequency drive or multiple speed motors on existing system $2,444 $7,188
MI0055 #05 Y:2003 Use adjustable frequency drive or multiple speed motors on existing system $2,178 $3,364
MI0055 #04 Y:2003 Use adjustable frequency drive or multiple speed motors on existing system $5,121 $50,535
MI0055 #03 Y:2003 Turn off equipment when not in use $19,490 $2,100
MI0055 #02 Y:2003 Reschedule plant operations or reduce load to avoid peaks $3,500 $400
MI0055 #01 Y:2003 Change rate schedules or other changes in utility service $5,799 $600