Assessment Year | 2003 |
---|---|
Principal Product | Pharmaceutical (Tablets & Capsules) |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $50 M to 100M |
# of Employees | 264 |
Plant Area |
46,723
ft2
|
Annual Production | 375,000,000
pieces
|
Production Hrs. Annual | 0
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $379,222 | 8,071,978 |
kWh
|
$0.047 |
Electricity Demand | $185,896 | 18,664 |
kW-mo/yr
|
$9.96 |
Natural Gas | $190,445 | 31,170 |
MMBtu
|
$6.11 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $344,913 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,406 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $17,331 | $1,000 | - | - | - | - | $17,331 | |
02 | 2.6218: Turn off equipment when not in use | $10,356 | $3,900 |
$10,356
147,943
kWh
|
- | - | - | - | |
03 | 2.2113: Repair or replace steam traps | $3,177 | $1,160 | - | - |
$3,177
-
MMBtu
|
- | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,284 | $441 |
$2,284
32,629
kWh
|
- | - | - | - | |
05 | 2.4133: Use most efficient type of electric motors | $2,707 | $6,341 |
$2,285
32,275
kWh
|
$422
-
kW-mo/yr
|
- | - | - | |
06 | 2.7232: Replace existing hvac unit with high efficiency model | $7,443 | $400,000 |
$7,443
106,329
kWh
|
- | - | - | - | |
07 | 2.2414: Use waste heat from hot flue gases to preheat | $38,829 | $70,000 | - | - |
$38,829
-
MMBtu
|
- | - | |
08 | 3.4155: Meter waste water | $12,786 | $1,950 | - | - | - |
$12,786
-
Tgal
|
- | |
09 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $250,000 | $43,000 | - | - | - |
$250,000
-
Tgal
|
- | |
TOTAL RECOMMENDED | $344,913 | $527,792 |
$22,368
319,176
kWh
|
$422
-
kW-mo/yr
|
$42,006
-
MMBtu
|
$262,786
-
Tgal
|
$17,331 | ||
TOTAL IMPLEMENTED | $23,406 | $403,110 |
$7,443
106,329
kWh
|
- |
$3,177
-
MMBtu
|
$12,786
-
Tgal
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs