ITAC Assessment: UW2319
ITAC logo
ITAC Assessment: UW2319
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product resin, fiberglass, carbon fiber
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area 127,500
ft2
Annual Production 3,000
units
Production Hrs. Annual 7,722
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $292,365 3,617,400
kWh
Electricity Demand $108,360 17,665
kW-mo/yr
Electricity Fees $60,444 -
Natural Gas $80,548 6,485
MMBtu
Waste Disposal Costs
Water Usage $23,784 664
Tgal
TOTAL YEARLY COSTS $565,501
RECOMMENDED SAVINGS* $843,540 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Product Savings
01 2.7491: Insulate glazing, walls, ceilings, and roofs $56,470 $23,651 $52,344
451,241
kWh
$3,794
-
kW-mo/yr
$332
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,837 $2,080 $17,402
150,015
kWh
$1,435
-
kW-mo/yr
- -
03 2.2511: Insulate bare equipment $1,001 $2,820 - - $1,001
-
MMBtu
-
04 2.2622: Replace existing chiller with high efficiency model $11,443 $68,000 $10,670
91,980
kWh
$773
-
kW-mo/yr
- -
05 2.4221: Install compressor air intakes in coolest locations $5,789 $3,000 $5,348
46,106
kWh
$441
-
kW-mo/yr
- -
06 2.3142: User battery storage for power quality issues $750,000 $871,000 - - - $750,000
TOTAL RECOMMENDED $843,540 $970,551 $85,764
739,342
kWh
$6,443
-
kW-mo/yr
$1,333
-
MMBtu
$750,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs