Assessment Year | 2003 |
---|---|
Principal Product | Pharmaceutical (Generic Drugs) |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $10 M to 50M |
# of Employees | 38 |
Plant Area |
134,612
ft2
|
Annual Production | 640,000,000
pieces
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $107,304 | 2,132,140 |
kWh
|
$0.050 |
Electricity Demand | $33,240 | 350 |
kW-mo/yr
|
$94.97 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $48,574 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $5,799 | $600 | n/a | - | $5,799 |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,500 | $400 | n/a | - | $3,500 |
03 | 2.6218: Turn off equipment when not in use | $19,490 | $2,100 | n/a |
$19,490
516,687
kWh
|
- |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,121 | $50,535 | n/a |
$5,121
112,332
kWh
|
- |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,178 | $3,364 | n/a |
$2,178
38,972
kWh
|
- |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,444 | $7,188 | n/a |
$2,444
53,577
kWh
|
- |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,020 | $3,085 | n/a |
$3,020
66,225
kWh
|
- |
08 | 4.522: Modify storage space to avoid rental of a warehouse | $2,584 | $3,000 | n/a | - | $2,584 |
09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,438 | $4,636 | n/a |
$4,438
63,396
kWh
|
- |
TOTAL RECOMMENDED | $48,574 | $74,908 |
$36,691
851,189
kWh
|
$11,883 | ||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs