| Assessment Year | 2003 |
|---|---|
| Principal Product | Pharmaceutical (Generic Drugs) |
| NAICS | 325412: Pharmaceutical Preparation Manufacturing |
| SIC | 2834: Pharmaceutical Preparations |
| Sales Range | $10 M to 50M |
| # of Employees | 38 |
| Plant Area |
134,612
ft2
|
| Annual Production | 640,000,000
pieces
|
| Production Hrs. Annual | 2,210
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $107,304 | 2,132,140 |
kWh
|
$0.050 |
| Electricity Demand | $33,240 | 350 |
kW-mo/yr
|
$94.97 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $48,574 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $5,799 | $600 | n/a | - | $5,799 |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,500 | $400 | n/a | - | $3,500 |
| 03 | 2.6218: Turn off equipment when not in use | $19,490 | $2,100 | n/a |
$19,490
516,687
kWh
|
- |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,121 | $50,535 | n/a |
$5,121
112,332
kWh
|
- |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,178 | $3,364 | n/a |
$2,178
38,972
kWh
|
- |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,444 | $7,188 | n/a |
$2,444
53,577
kWh
|
- |
| 07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,020 | $3,085 | n/a |
$3,020
66,225
kWh
|
- |
| 08 | 4.522: Modify storage space to avoid rental of a warehouse | $2,584 | $3,000 | n/a | - | $2,584 |
| 09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,438 | $4,636 | n/a |
$4,438
63,396
kWh
|
- |
| TOTAL RECOMMENDED | $48,574 | $74,908 |
$36,691
851,189
kWh
|
$11,883 | ||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs