ITAC Assessment: MI0055
ITAC logo
ITAC Assessment: MI0055
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Pharmaceutical (Generic Drugs)
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 38
Plant Area 134,612
ft2
Annual Production 640,000,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,304 2,132,140
kWh
Electricity Demand $33,240 350
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,574 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $5,799 $600 n/a - $5,799
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,500 $400 n/a - $3,500
03 2.6218: Turn off equipment when not in use $19,490 $2,100 n/a $19,490
516,687
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,121 $50,535 n/a $5,121
112,332
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,178 $3,364 n/a $2,178
38,972
kWh
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,444 $7,188 n/a $2,444
53,577
kWh
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,020 $3,085 n/a $3,020
66,225
kWh
-
08 4.522: Modify storage space to avoid rental of a warehouse $2,584 $3,000 n/a - $2,584
09 2.7447: Install vinyl strip / high speed / air curtain doors $4,438 $4,636 n/a $4,438
63,396
kWh
-
TOTAL RECOMMENDED $48,574 $74,908 $36,691
851,189
kWh
$11,883
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs