ITAC Assessment: HO0119
ITAC logo
ITAC Assessment: HO0119
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Steel Shelving
NAICS
n/a
SIC 2542: Office and Store Fixtures, Partitions, Shelving, and Lockers, Except Wood
Sales Range $1
M
to 5
M
# of Employees 10
Plant Area 24,000
ft2
Annual Production 1,400,000
lb
Production Hrs. Annual 2,040
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,703 107,562
kWh
Natural Gas $15,167 1,540
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,997 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,315 $893 $2,315
9,086
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $521 $416 $521
2,052
kWh
- -
03 2.4133: Use most efficient type of electric motors $104 $193 $104
586
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $478 $750 $478
1,758
kWh
- -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,745 $12,500 $8,079
13,482
kWh
$(-2,634.0)
-
MMBtu
$300
06 2.6218: Turn off equipment when not in use $834 $1,500 $834
13,189
kWh
- -
TOTAL RECOMMENDED $9,997 $16,252 $12,331
40,153
kWh
$(-2,634.0)
-
MMBtu
$300
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs