*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Pharmaceutical (Generic Drugs)
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 200,000
ft2
Annual Production 750,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,099,187 22,952,325
kWh
Electricity Demand $417,027 42,555
kW-mo/yr
Natural Gas $363,235 54,149
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,153,313 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $823,693

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings Primary Product Savings
01 2.8114: Change rate schedules or other changes in utility service $180,266 $2,000 - - - - $180,266 -
02 4.111: Add equipment/ operators to reduce production bottleneck $281,112 $88,736 - - - - - $281,112
03 2.4322: Use or replace with energy efficient substitutes $1,817 $4,301 $1,538
17,988
kWh
$279
-
kW-mo/yr
- - - -
04 2.1223: Install smaller boiler (increase high fire duty cycle) $147,537 $25,000 - - $147,537
-
MMBtu
- - -
05 2.2113: Repair or replace steam traps $7,955 $904 - - $7,955
-
MMBtu
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,054 $40,600 $9,054
129,345
kWh
- - - - -
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $500,000 $43,000 - - - $500,000
-
Tgal
- -
08 3.4155: Meter waste water $25,572 $1,950 - - - $25,572
-
Tgal
- -
TOTAL RECOMMENDED $1,153,313 $206,491 $10,592
147,333
kWh
$279
-
kW-mo/yr
$155,492
-
MMBtu
$525,572
-
Tgal
$180,266 $281,112
TOTAL IMPLEMENTED $823,693 $175,190 $9,054
129,345
kWh
- $7,955
-
MMBtu
$525,572
-
Tgal
- $281,112
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs