Assessment Year | 2003 |
---|---|
Principal Product | Pharmaceutical (Generic Drugs) |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $50 M to 100M |
# of Employees | 100 |
Plant Area |
200,000
ft2
|
Annual Production | 750,000,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,099,187 | 22,952,325 |
kWh
|
$0.048 |
Electricity Demand | $417,027 | 42,555 |
kW-mo/yr
|
$9.80 |
Natural Gas | $363,235 | 54,149 |
MMBtu
|
$6.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,153,313 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $823,693 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $180,266 | $2,000 | - | - | - | - | $180,266 | - | |
02 | 4.111: Add equipment/ operators to reduce production bottleneck | $281,112 | $88,736 | - | - | - | - | - | $281,112 | |
03 | 2.4322: Use or replace with energy efficient substitutes | $1,817 | $4,301 |
$1,538
17,988
kWh
|
$279
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $147,537 | $25,000 | - | - |
$147,537
-
MMBtu
|
- | - | - | |
05 | 2.2113: Repair or replace steam traps | $7,955 | $904 | - | - |
$7,955
-
MMBtu
|
- | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,054 | $40,600 |
$9,054
129,345
kWh
|
- | - | - | - | - | |
07 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $500,000 | $43,000 | - | - | - |
$500,000
-
Tgal
|
- | - | |
08 | 3.4155: Meter waste water | $25,572 | $1,950 | - | - | - |
$25,572
-
Tgal
|
- | - | |
TOTAL RECOMMENDED | $1,153,313 | $206,491 |
$10,592
147,333
kWh
|
$279
-
kW-mo/yr
|
$155,492
-
MMBtu
|
$525,572
-
Tgal
|
$180,266 | $281,112 | ||
TOTAL IMPLEMENTED | $823,693 | $175,190 |
$9,054
129,345
kWh
|
- |
$7,955
-
MMBtu
|
$525,572
-
Tgal
|
- | $281,112 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs