Assessment Year | 2010 |
---|---|
Principal Product | wholesale signs |
NAICS | 339950: Sign Manufacturing |
SIC | 3993: Signs and Advertising Specialties |
Sales Range | $5 M to 10M |
# of Employees | 55 |
Plant Area |
65,000
ft2
|
Annual Production | 11,000
pieces
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $114,381 | 1,407,247 |
kWh
|
$0.081 |
Electricity Fees | $16,172 | - |
|
- |
Natural Gas | $32,591 | 2,096 |
MMBtu
|
$15.55 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $70,167 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $31,811 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2211: Use optimum temperature | $30,674 | $1,072 |
$30,674
377,387
kWh
|
- | |
02 | 2.2515: Use optimum thickness insulation | $12,398 | $1,602 |
$12,398
152,541
kWh
|
- | |
03 | 2.2212: Use minimum safe oven ventilation | $4,422 | $990 |
$4,422
54,000
kWh
|
- | |
04 | 2.2511: Insulate bare equipment | $14,550 | $5,020 |
$14,550
179,000
kWh
|
- | |
05 | 2.7231: Use radiant heater for spot heating | $3,444 | $1,970 | - |
$3,444
-
MMBtu
|
|
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,545 | $640 |
$1,545
19,013
kWh
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,014 | $1,500 |
$1,014
12,478
kWh
|
- | |
08 | 2.7134: Use photocell controls | $983 | $354 |
$983
12,094
kWh
|
- | |
09 | 2.7132: Install timers on light switches in little used areas | $341 | $106 |
$341
4,190
kWh
|
- | |
10 | 2.7135: Install occupancy sensors | $559 | $387 |
$559
6,878
kWh
|
- | |
11 | 2.7122: Disconnect ballasts | $123 | $80 |
$123
1,514
kWh
|
- | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $114 | $250 |
$114
1,398
kWh
|
- | |
TOTAL RECOMMENDED | $70,167 | $13,971 |
$66,723
820,493
kWh
|
$3,444
-
MMBtu
|
||
TOTAL IMPLEMENTED | $31,811 | $2,652 |
$31,811
391,379
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs