1,221
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Pharmaceutical preparations | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UU0064 #03 Y:2004 | 03 | 2004 | Eliminate or reduce compressed air usage | $2,624 | $2,400 | |
| UU0064 #02 Y:2004 | 02 | 2004 | Replace fossil fuel equipment with electrical equipment | $2,876 | $2,255 | |
| UU0064 #01 Y:2004 | 01 | 2004 | Recover waste heat from equipment | $14,228 | $70,000 | |
| WI0472 #08 Y:2004 | 08 | 2004 | Recharge batteries on during off-peak demand periods | $1,032 | $700 | n/a |
| WI0472 #07 Y:2004 | 07 | 2004 | Analyze flue gas for proper air/fuel ratio | $566 | $500 | n/a |
| WI0472 #06 Y:2004 | 06 | 2004 | Use waste heat from hot flue gases to preheat | $1,106 | $5,500 | n/a |
| WI0472 #05 Y:2004 | 05 | 2004 | Use closed cycle process to minimize waste water production | $1,375 | $1,145 | n/a |
| WI0472 #04 Y:2004 | 04 | 2004 | Install compressor air intakes in coolest locations | $596 | $640 | n/a |
| WI0472 #03 Y:2004 | 03 | 2004 | Install occupancy sensors | $1,700 | $5,500 | n/a |
| WI0472 #02 Y:2004 | 02 | 2004 | Use adjustable frequency drive or multiple speed motors on existing system | $5,258 | $9,780 | n/a |
| WI0472 #01 Y:2004 | 01 | 2004 | Utilize higher efficiency lamps and/or ballasts | $6,956 | $16,640 | n/a |
| NC0283 #05 Y:2004 | 05 | 2004 | Install occupancy sensors | $1,077 | $356 | |
| NC0283 #04 Y:2004 | 04 | 2004 | Utilize higher efficiency lamps and/or ballasts | $4,379 | $6,899 | |
| NC0283 #03 Y:2004 | 03 | 2004 | Use heat from boiler blowdown to preheat boiler feed water | $1,469 | $1,200 | |
| NC0283 #02 Y:2004 | 02 | 2004 | Recover and reuse cooling water | $7,112 | $6,000 | |
| NC0283 #01 Y:2004 | 01 | 2004 | Add equipment/ operators to reduce production bottleneck | $22,500 | $18,300 | |
| MS0224 #12 Y:2003 | 12 | 2003 | Insulate bare equipment | $3,422 | $301 | |
| MS0224 #11 Y:2003 | 11 | 2003 | Eliminate or reduce compressed air usage | $4,861 | $7,596 | |
| MS0224 #10 Y:2003 | 10 | 2003 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,641 | $181 | |
| MS0224 #09 Y:2003 | 09 | 2003 | Replace electrically-operated equipment with fossil fuel equipment | $8,477 | $1,560 |