Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,221

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Pharmaceutical preparations
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0064 #03 Y:2004 Eliminate or reduce compressed air usage $2,624 $2,400
UU0064 #02 Y:2004 Replace fossil fuel equipment with electrical equipment $2,876 $2,255
UU0064 #01 Y:2004 Recover waste heat from equipment $14,228 $70,000
WI0472 #08 Y:2004 Recharge batteries on during off-peak demand periods $1,032 $700
WI0472 #07 Y:2004 Analyze flue gas for proper air/fuel ratio $566 $500
WI0472 #06 Y:2004 Use waste heat from hot flue gases to preheat $1,106 $5,500
WI0472 #05 Y:2004 Use closed cycle process to minimize waste water production $1,375 $1,145
WI0472 #04 Y:2004 Install compressor air intakes in coolest locations $596 $640
WI0472 #03 Y:2004 Install occupancy sensors $1,700 $5,500
WI0472 #02 Y:2004 Use adjustable frequency drive or multiple speed motors on existing system $5,258 $9,780
WI0472 #01 Y:2004 Utilize higher efficiency lamps and/or ballasts $6,956 $16,640
NC0283 #05 Y:2004 Install occupancy sensors $1,077 $356
NC0283 #04 Y:2004 Utilize higher efficiency lamps and/or ballasts $4,379 $6,899
NC0283 #03 Y:2004 Use heat from boiler blowdown to preheat boiler feed water $1,469 $1,200
NC0283 #02 Y:2004 Recover and reuse cooling water $7,112 $6,000
NC0283 #01 Y:2004 Add equipment/ operators to reduce production bottleneck $22,500 $18,300
MS0224 #12 Y:2003 Insulate bare equipment $3,422 $301
MS0224 #11 Y:2003 Eliminate or reduce compressed air usage $4,861 $7,596
MS0224 #10 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $7,641 $181
MS0224 #09 Y:2003 Replace electrically-operated equipment with fossil fuel equipment $8,477 $1,560