| Assessment Year | 2004 |
|---|---|
| Principal Product | Pharmaceutical contrast media |
| NAICS | 325412: Pharmaceutical Preparation Manufacturing |
| SIC | 2834: Pharmaceutical Preparations |
| Sales Range | greater than $500 M |
| # of Employees | 190 |
| Plant Area |
150,000
ft2
|
| Annual Production | 370
Tgal
|
| Production Hrs. Annual | 5,000
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $270,979 | 9,767,003 |
kWh
|
$0.028 |
| Electricity Demand | $184,319 | 17,709 |
kW-mo/yr
|
$10.41 |
| Electricity Fees | $12,364 | - |
|
- |
| Natural Gas | $106,076 | 17,142 |
MMBtu
|
$6.19 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $36,537 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,658 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.111: Add equipment/ operators to reduce production bottleneck | $22,500 | $18,300 | - | - | - | - | $22,500 | |
| 02 | 3.4115: Recover and reuse cooling water | $7,112 | $6,000 |
$(-157.0)
(-5,400)
kWh
|
$(-29.0)
-
kW-mo/yr
|
$5,414
-
MMBtu
|
$1,884
-
Tgal
|
- | |
| 03 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $1,469 | $1,200 | - | - |
$904
-
MMBtu
|
$565
-
Tgal
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,379 | $6,899 |
$3,446
146,119
kWh
|
$933
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.7135: Install occupancy sensors | $1,077 | $356 |
$1,077
37,128
kWh
|
- | - | - | - | |
| TOTAL RECOMMENDED | $36,537 | $32,755 |
$4,366
177,847
kWh
|
$904
-
kW-mo/yr
|
$6,318
-
MMBtu
|
$2,449
-
Tgal
|
$22,500 | ||
| TOTAL IMPLEMENTED | $9,658 | $7,556 |
$920
31,728
kWh
|
$(-29.0)
-
kW-mo/yr
|
$6,318
-
MMBtu
|
$2,449
-
Tgal
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs