ITAC Assessment: NC0283
ITAC logo
ITAC Assessment: NC0283
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Pharmaceutical contrast media
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range greater than $500
M
# of Employees 190
Plant Area 150,000
ft2
Annual Production 370
Tgal
Production Hrs. Annual 5,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $270,979 9,767,003
kWh
Electricity Demand $184,319 17,709
kW-mo/yr
Electricity Fees $12,364 -
Natural Gas $106,076 17,142
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,537 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,658

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $22,500 $18,300 - - - - $22,500
02 3.4115: Recover and reuse cooling water $7,112 $6,000 $(-157.0)
(-5,400)
kWh
$(-29.0)
-
kW-mo/yr
$5,414
-
MMBtu
$1,884
-
Tgal
-
03 2.1243: Use heat from boiler blowdown to preheat boiler feed water $1,469 $1,200 - - $904
-
MMBtu
$565
-
Tgal
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,379 $6,899 $3,446
146,119
kWh
$933
-
kW-mo/yr
- - -
05 2.7135: Install occupancy sensors $1,077 $356 $1,077
37,128
kWh
- - - -
TOTAL RECOMMENDED $36,537 $32,755 $4,366
177,847
kWh
$904
-
kW-mo/yr
$6,318
-
MMBtu
$2,449
-
Tgal
$22,500
TOTAL IMPLEMENTED $9,658 $7,556 $920
31,728
kWh
$(-29.0)
-
kW-mo/yr
$6,318
-
MMBtu
$2,449
-
Tgal
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs