ITAC Assessment: WI0472
ITAC logo
ITAC Assessment: WI0472
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Vitamin Supplements
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $50
M
to 100
M
# of Employees 230
Plant Area 150,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,869 3,676,760
kWh
Electricity Demand $59,891 8,053
kW-mo/yr
Electricity Fees $10,479 -
Natural Gas $66,773 10,486
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,589 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,956 $16,640 n/a $4,556
152,880
kWh
$2,400
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,258 $9,780 n/a $5,258
176,446
kWh
- -
03 2.7135: Install occupancy sensors $1,700 $5,500 n/a $1,700
57,069
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $596 $640 n/a $376
12,620
kWh
$220
-
kW-mo/yr
-
05 3.4111: Use closed cycle process to minimize waste water production $1,375 $1,145 n/a $901
30,213
kWh
$474
-
kW-mo/yr
-
06 2.2414: Use waste heat from hot flue gases to preheat $1,106 $5,500 n/a - - $1,106
-
MMBtu
07 2.1233: Analyze flue gas for proper air/fuel ratio $566 $500 n/a - - $566
-
MMBtu
08 2.3132: Recharge batteries on during off-peak demand periods $1,032 $700 n/a - $1,032
-
kW-mo/yr
-
TOTAL RECOMMENDED $18,589 $40,405 $12,791
429,228
kWh
$4,126
-
kW-mo/yr
$1,672
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs