Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,244

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Pharmaceutical preparations
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0259 #01 Y:2007 Use / purchase optimum sized compressor $15,497 $7,000
MS0318 #07 Y:2007 Utilize energy-efficient belts and other improved mechanisms $205 $434
MS0318 #06 Y:2007 Analyze flue gas for proper air/fuel ratio $587 -
MS0318 #05 Y:2007 Use waste heat from hot flue gases to preheat $747 $378
MS0318 #04 Y:2007 Repair and eliminate steam leaks $2,805 $156
MS0318 #03 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $3,013 $401
MS0318 #02 Y:2007 Utilize higher efficiency lamps and/or ballasts $3,884 $20,897
MS0318 #01 Y:2007 Utilize higher efficiency lamps and/or ballasts $10,453 $34,528
LL0271 #10 Y:2007 Conserve energy by efficient use of vending machines $252 $454
LL0271 #09 Y:2007 Conserve energy by efficient use of vending machines $365 $638
LL0271 #08 Y:2007 Insulate bare equipment $1,886 $1,500
LL0271 #07 Y:2007 Begin a practice of predictive / preventative maintenance $2,580 $2,366
LL0271 #06 Y:2007 Reduce the pressure of compressed air to the minimum required $4,133 $15
LL0271 #05 Y:2007 Utilize higher efficiency lamps and/or ballasts $4,159 $5,905
LL0271 #04 Y:2007 Install occupancy sensors $7,569 $3,000
LL0271 #03 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $9,710 $3,760
LL0271 #02 Y:2007 Reduce illumination to minimum necessary levels $17,275 $1,587
LL0271 #01 Y:2007 Preheat boiler makeup water with waste process heat $78,849 $24,500
SF0340 #18 Y:2006 Install adequate dryers on air lines to eliminate blowdown $3,904 $16,738
SF0340 #17 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $2,135 $6,224