ITAC Assessment: LL0271
ITAC logo
ITAC Assessment: LL0271
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Pharmaceuticlals
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 310,000
ft2
Annual Production 2,400,000,000
pieces
Production Hrs. Annual 5,000
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $719,325 13,765,500
kWh
Natural Gas $465,514 45,917
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $126,778 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,952

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.2441: Preheat boiler makeup water with waste process heat $78,849 $24,500 - $78,849
-
MMBtu
-
02 2.7111: Reduce illumination to minimum necessary levels $17,275 $1,587 $17,275
330,552
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,710 $3,760 $9,710
185,803
kWh
- -
04 2.7135: Install occupancy sensors $7,569 $3,000 $7,569
144,834
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,159 $5,905 $4,159
79,587
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $4,133 $15 $4,133
79,089
kWh
- -
07 4.611: Begin a practice of predictive / preventative maintenance $2,580 $2,366 - - $2,580
08 2.2511: Insulate bare equipment $1,886 $1,500 - $1,886
-
MMBtu
-
09 2.6211: Conserve energy by efficient use of vending machines $365 $638 $365
6,989
kWh
- -
10 2.6211: Conserve energy by efficient use of vending machines $252 $454 $252
4,822
kWh
- -
TOTAL RECOMMENDED $126,778 $43,725 $43,463
831,676
kWh
$80,735
-
MMBtu
$2,580
TOTAL IMPLEMENTED $18,952 $14,623 $14,486
277,201
kWh
$1,886
-
MMBtu
$2,580
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs