Assessment Year | 2007 |
---|---|
Principal Product | Pharmaceuticlals |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
310,000
ft2
|
Annual Production | 2,400,000,000
pieces
|
Production Hrs. Annual | 5,000
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $719,325 | 13,765,500 |
kWh
|
$0.052 |
Natural Gas | $465,514 | 45,917 |
MMBtu
|
$10.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $126,778 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,952 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2441: Preheat boiler makeup water with waste process heat | $78,849 | $24,500 | - |
$78,849
-
MMBtu
|
- | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $17,275 | $1,587 |
$17,275
330,552
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,710 | $3,760 |
$9,710
185,803
kWh
|
- | - | |
04 | 2.7135: Install occupancy sensors | $7,569 | $3,000 |
$7,569
144,834
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,159 | $5,905 |
$4,159
79,587
kWh
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,133 | $15 |
$4,133
79,089
kWh
|
- | - | |
07 | 4.611: Begin a practice of predictive / preventative maintenance | $2,580 | $2,366 | - | - | $2,580 | |
08 | 2.2511: Insulate bare equipment | $1,886 | $1,500 | - |
$1,886
-
MMBtu
|
- | |
09 | 2.6211: Conserve energy by efficient use of vending machines | $365 | $638 |
$365
6,989
kWh
|
- | - | |
10 | 2.6211: Conserve energy by efficient use of vending machines | $252 | $454 |
$252
4,822
kWh
|
- | - | |
TOTAL RECOMMENDED | $126,778 | $43,725 |
$43,463
831,676
kWh
|
$80,735
-
MMBtu
|
$2,580 | ||
TOTAL IMPLEMENTED | $18,952 | $14,623 |
$14,486
277,201
kWh
|
$1,886
-
MMBtu
|
$2,580 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs