ITAC Assessment: MS0318
ITAC logo
ITAC Assessment: MS0318
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Pharmaceutical
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 114,000
ft2
Annual Production 12,000,000
units
Production Hrs. Annual 2,080
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,567 1,314,760
kWh
Electricity Demand $31,425 4,435
kW-mo/yr
Electricity Fees $1,438 -
Natural Gas $24,620 1,233
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,694 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,742

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,453 $34,528 $3,435
83,321
kWh
$6,864
-
kW-mo/yr
$154 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,884 $20,897 $1,229
31,525
kWh
$2,597
-
kW-mo/yr
$58 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,013 $401 $2,969
72,022
kWh
- $44 -
04 2.2135: Repair and eliminate steam leaks $2,805 $156 - - - $2,805
-
MMBtu
05 2.2414: Use waste heat from hot flue gases to preheat $747 $378 - - - $747
-
MMBtu
06 2.1233: Analyze flue gas for proper air/fuel ratio $587 - - - - $587
-
MMBtu
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $205 $434 $45
1,096
kWh
$157
-
kW-mo/yr
$3 -
TOTAL RECOMMENDED $21,694 $56,794 $7,678
187,964
kWh
$9,618
-
kW-mo/yr
$259 $4,139
-
MMBtu
TOTAL IMPLEMENTED $20,742 $55,982 $7,633
186,868
kWh
$9,461
-
kW-mo/yr
$256 $3,392
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs