Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Molded Plastic Products
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 40,000
ft2
Annual Production 1,200,000
pieces
Production Hrs. Annual 8,568
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $151,383 3,013,800
kWh
Electricity Demand $34,290 80,484
kW-mo/yr
Electricity Fees $1,398 -
Natural Gas $8,042 944
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,720 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,220

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Product Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,300 $1,500 $1,100
21,500
kWh
$200
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $5,070 $1,830 $4,320
82,800
kWh
$750
-
kW-mo/yr
- -
03 4.431: Train operators for maximum operating efficiency $16,000 - - - - $16,000
04 4.445: Install equipment to move product $37,500 $14,200 - - $37,500 -
05 4.423: Move product using mechanical means $7,850 $2,320 - - $7,850 -
TOTAL RECOMMENDED $67,720 $19,850 $5,420
104,300
kWh
$950
-
kW-mo/yr
$45,350 $16,000
TOTAL IMPLEMENTED $30,220 $5,650 $5,420
104,300
kWh
$950
-
kW-mo/yr
$7,850 $16,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs