ITAC Assessment: LE0259
ITAC logo
ITAC Assessment: LE0259
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Pharmaceuticals
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 130,000
ft2
Annual Production 36,000
pieces
Production Hrs. Annual 3,000
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $287,124 3,789,744
kWh
Electricity Demand $59,461 9,349
kW-mo/yr
Natural Gas $186,669 13,921
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,000 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,064

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4226: Use / purchase optimum sized compressor $15,497 $7,000 $8,504
111,900
kWh
$1,993
-
kW-mo/yr
- $5,000
02 2.7221: Lower temperature during the winter season and vice-versa $15,235 $500 $11,912
156,739
kWh
$3,323
-
kW-mo/yr
- -
03 2.7232: Replace existing hvac unit with high efficiency model $14,283 $45,000 $8,536
112,320
kWh
$2,223
-
kW-mo/yr
$3,524
-
MMBtu
-
04 2.7232: Replace existing hvac unit with high efficiency model $11,735 $37,000 $5,745
75,600
kWh
$1,870
-
kW-mo/yr
$4,120
-
MMBtu
-
05 2.2625: Chill water to the highest temperature possible $1,811 $200 $1,357
17,850
kWh
$454
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,501 $50 $1,501
19,747
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,938 $4,386 $2,510
33,022
kWh
$428
-
kW-mo/yr
- -
TOTAL RECOMMENDED $63,000 $94,136 $40,065
527,178
kWh
$10,291
-
kW-mo/yr
$7,644
-
MMBtu
$5,000
TOTAL IMPLEMENTED $43,064 $82,700 $27,550
362,509
kWh
$7,870
-
kW-mo/yr
$7,644
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs