Assessment Year | 2007 |
---|---|
Principal Product | Pharmaceutical Intermediates |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $50 M to 100M |
# of Employees | 350 |
Plant Area |
495,000
ft2
|
Annual Production | 1
units
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,082,600 | 27,991,500 |
kWh
|
$0.074 |
Natural Gas | $1,025,200 | 120,084 |
MMBtu
|
$8.54 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $549,611 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $267,877 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $13,354 | - | - |
$13,354
-
MMBtu
|
|
02 | 2.2135: Repair and eliminate steam leaks | $12,059 | $320 | - |
$12,059
-
MMBtu
|
|
03 | 2.2135: Repair and eliminate steam leaks | $6,510 | - | - |
$6,510
-
MMBtu
|
|
04 | 2.2122: Install / repair insulation on condensate lines | $155,963 | $36,556 | - |
$155,963
-
MMBtu
|
|
05 | 2.261: Cooling towers | $14,070 | $3,000 |
$14,070
189,117
kWh
|
- | |
06 | 2.2136: Install / repair insulation on steam lines | $6,921 | $1,133 | - |
$6,921
-
MMBtu
|
|
07 | 2.2122: Install / repair insulation on condensate lines | $12,710 | $4,246 | - |
$12,710
-
MMBtu
|
|
08 | 2.7132: Install timers on light switches in little used areas | $4,828 | $1,892 |
$4,828
64,891
kWh
|
- | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $23,910 | $12,188 |
$23,910
321,369
kWh
|
- | |
10 | 2.2621: Modify refrigeration system to operate at a lower pressure | $125,591 | $80,000 |
$125,591
1,688,029
kWh
|
- | |
11 | 2.2414: Use waste heat from hot flue gases to preheat | $21,896 | $15,000 | - |
$21,896
-
MMBtu
|
|
12 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $18,702 | $15,428 |
$18,702
251,372
kWh
|
- | |
13 | 2.4133: Use most efficient type of electric motors | $4,410 | $3,712 |
$4,410
220,945
kWh
|
- | |
14 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $70,597 | $65,970 |
$70,597
948,883
kWh
|
- | |
15 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $20,697 | $37,793 |
$20,697
278,180
kWh
|
- | |
16 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $31,354 | $70,400 |
$31,354
421,425
kWh
|
- | |
17 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,135 | $6,224 |
$2,135
28,694
kWh
|
- | |
18 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $3,904 | $16,738 |
$3,904
52,476
kWh
|
- | |
TOTAL RECOMMENDED | $549,611 | $370,600 |
$320,198
4,465,381
kWh
|
$229,413
-
MMBtu
|
||
TOTAL IMPLEMENTED | $267,877 | $166,101 |
$79,991
1,236,813
kWh
|
$187,886
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs