Assessment Year | 1988 |
---|---|
Principal Product | ELECTRO. STEEL STRIPS |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $10 M to 50M |
# of Employees | 106 |
Plant Area |
n/a
|
Annual Production | 28,000
thousand feet
|
Production Hrs. Annual | 8,361
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $518,959 | 7,947,245 |
kWh
|
$0.065 |
Natural Gas | $353,210 | 84,605 |
MMBtu
|
$4.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $30,470 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,912 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $967 | $4,500 |
$967
14,947
kWh
|
- | |
02 | 2.4312: Improve lubrication practices | $2,184 | $1,600 |
$2,184
33,705
kWh
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,924 | - |
$1,924
29,601
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,455 | $6,700 |
$8,455
130,129
kWh
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $499 | $302 |
$499
7,620
kWh
|
- | |
06 | 2.2135: Repair and eliminate steam leaks | $6,034 | - | - |
$6,034
-
MMBtu
|
|
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $10,407 | $500 | - |
$10,407
-
MMBtu
|
|
TOTAL RECOMMENDED | $30,470 | $13,602 |
$14,029
216,002
kWh
|
$16,441
-
MMBtu
|
||
TOTAL IMPLEMENTED | $16,912 | $7,002 |
$10,878
167,350
kWh
|
$6,034
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs