| Assessment Year | 2025 |
|---|---|
| Principal Product | LED Lighting Components |
| NAICS | 336320: Motor Vehicle Electrical and Electronic Equipment Manufacturing |
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $50 M to 100M |
| # of Employees | 180 |
| Plant Area |
140,000
ft2
|
| Annual Production | 21,000,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $445,260 | 4,105,000 |
kWh
|
$0.11 | |
| Electricity Demand | $126,049 | 8,703 |
kW-mo/yr
|
$14.48 | |
| Natural Gas | $15,646 | 1,751 |
MMBtu
|
$8.94 | |
| Waste Disposal Costs | |||||
| Water Usage | $13,260 | 443 |
Tgal
|
$29.91 | |
| Water Disposal | $2,538 | 443 |
Tgal
|
$5.72 | |
| TOTAL YEARLY COSTS | $602,753 | ||||
| RECOMMENDED SAVINGS* | $189,312 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.8121: Apply for tax-free status for energy purchases | $23,167 | - | - | $23,167 | - | |
| 02 | 4.721: Initiate a program to acquire iso certification | $17,037 | $20,000 |
$16,475
151,885
kWh
|
- |
$562
-
MMBtu
|
|
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,990 | $1,615 |
$12,990
120,274
kWh
|
- | - | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,686 | $375 |
$1,686
15,539
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $35,242 | $92,000 |
$35,242
324,904
kWh
|
- | - | |
| 06 | 2.9113: Use solar heat for heat | $55,780 | $305,370 |
$55,780
557,795
kWh
|
- | - | |
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $11,473 | $16,500 |
$11,473
105,768
kWh
|
- | - | |
| 08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,647 | $810 |
$2,647
24,400
kWh
|
- | - | |
| 09 | 2.2437: Recover waste heat from equipment | $8,477 | $5,000 | - | - |
$8,477
-
MMBtu
|
|
| 10 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $20,815 | $5,200 |
$20,815
192,745
kWh
|
- | - | |
| TOTAL RECOMMENDED | $189,312 | $446,870 |
$157,106
1,493,309
kWh
|
$23,167 |
$9,039
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs