ITAC Assessment: NL0027
ITAC logo
ITAC Assessment: NL0027
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Compressed Natural Gas Tanks for Large Vehicle Use
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 130
Plant Area 108,000
ft2
Annual Production 30,000
units
Production Hrs. Annual 7,200
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $151,368 5,792,800
kWh
Electricity Demand $206,851 10,825
kW-mo/yr
Electricity Fees $86,616 -
Natural Gas $90,719 13,663
MMBtu
Waste Disposal Costs
Water Usage $47,169 15,667
Tgal
Water Disposal $46,415 15,667
Tgal
TOTAL YEARLY COSTS $629,139
RECOMMENDED SAVINGS* $49,070 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,963

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
01 3.4114: Replace city water with recycled water via cooling tower $24,797 $32,620 $(-1,123.0)
(-43,200)
kWh
- $12,960
-
Tgal
$12,960
-
Tgal
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $18,840 $74,980 $11,091
426,585
kWh
$10,709
-
kW-mo/yr
- - $(-2,960.0)
03 2.2511: Insulate bare equipment $4,500 $2,500 $2,264
87,000
kWh
$2,236
-
kW-mo/yr
- - -
04 2.4221: Install compressor air intakes in coolest locations $607 $1,050 $607
23,339
kWh
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $326 $1,000 $452
17,636
kWh
- - - $(-126.0)
TOTAL RECOMMENDED $49,070 $112,150 $13,291
511,360
kWh
$12,945
-
kW-mo/yr
$12,960
-
Tgal
$12,960
-
Tgal
$(-3,086.0)
TOTAL IMPLEMENTED $43,963 $108,600 $10,420
401,021
kWh
$10,709
-
kW-mo/yr
$12,960
-
Tgal
$12,960
-
Tgal
$(-3,086.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs