1,730
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MA0477 #05 Y:2000 | 05 | 2000 | Use adjustable frequency drive or multiple speed motors on existing system | $3,200 | $11,700 | |
| MA0477 #04 Y:2000 | 04 | 2000 | Reduce space conditioning during non-working hours | $3,910 | - | |
| MA0477 #03 Y:2000 | 03 | 2000 | Use cooling tower or economizer to replace chiller cooling | $6,580 | $21,000 | |
| MA0477 #02 Y:2000 | 02 | 2000 | Recover waste heat from equipment | $21,290 | $103,000 | |
| MA0477 #01 Y:2000 | 01 | 2000 | Chill water to the highest temperature possible | $22,890 | $2,000 | |
| OR0373 #07 Y:2000 | 07 | 2000 | Distill contaminated solvents for reuse | $244,000 | $110,000 | |
| OR0373 #06 Y:2000 | 06 | 2000 | Optimize plant power factor | $950 | $2,700 | |
| OR0373 #05 Y:2000 | 05 | 2000 | Use adjustable frequency drive or multiple speed motors on existing system | $2,083 | $6,300 | |
| OR0373 #04 Y:2000 | 04 | 2000 | Use most efficient type of electric motors | $6,115 | $11,205 | |
| OR0373 #03 Y:2000 | 03 | 2000 | Turn off equipment during breaks, reduce operating time | $2,186 | $630 | |
| OR0373 #02 Y:2000 | 02 | 2000 | Use separate switches on perimeter lighting which may be turned off when natural light is available | $262 | - | |
| OR0373 #01 Y:2000 | 01 | 2000 | Turn off equipment during breaks, reduce operating time | $9,100 | - | |
| MO0295 #04 Y:2000 | 04 | 2000 | Begin a practice of predictive / preventative maintenance | $11,160 | $3,700 | |
| MO0295 #03 Y:2000 | 03 | 2000 | Reduce the pressure of compressed air to the minimum required | $9,722 | $360 | |
| MO0295 #02 Y:2000 | 02 | 2000 | Install compressor air intakes in coolest locations | $7,737 | $1,525 | |
| MO0295 #01 Y:2000 | 01 | 2000 | Use most efficient type of electric motors | $8,207 | $12,145 | |
| SD0252 #09 Y:2000 | 09 | 2000 | Replace old machine with new automatic multi-station tool | $256,200 | $100,000 | |
| SD0252 #08 Y:2000 | 08 | 2000 | Contract a wood pallet recycling company | $2,240 | $30,000 | |
| SD0252 #07 Y:2000 | 07 | 2000 | Install skylights | $70,269 | $5,536 | |
| SD0252 #06 Y:2000 | 06 | 2000 | Eliminate or reduce compressed air usage | $2,692 | $1,500 |