ITAC Assessment: MO0295
ITAC logo
ITAC Assessment: MO0295
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Pharmaceuticals and Antibiotics
NAICS
n/a
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 435,600
ft2
Annual Production 700
ton
Production Hrs. Annual 8,232
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $644,200 23,856,976
kWh
Electricity Demand $178,032 2,707
kW-mo/yr
Electricity Fees $4 -
Natural Gas $137,685 57,799
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,826 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $8,207 $12,145 $6,431
238,277
kWh
$1,776
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $7,737 $1,525 $6,027
223,329
kWh
$1,710
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $9,722 $360 $7,617
282,239
kWh
$2,105
-
kW-mo/yr
-
04 4.611: Begin a practice of predictive / preventative maintenance $11,160 $3,700 - - $11,160
TOTAL RECOMMENDED $36,826 $17,730 $20,075
743,845
kWh
$5,591
-
kW-mo/yr
$11,160
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs