ITAC Assessment: NC0028
ITAC logo
ITAC Assessment: NC0028
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Electric Motors and Blowers
NAICS
n/a
SIC 3621: Motors and Generators
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 100,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,500
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,229 1,418,816
kWh
Natural Gas $10,551 1,807
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,419 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,107

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4221: Install compressor air intakes in coolest locations $153 $250 $153
2,345
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,218 $600 $2,218
32,532
kWh
03 2.7111: Reduce illumination to minimum necessary levels $787 $240 $787
13,775
kWh
04 2.4133: Use most efficient type of electric motors $736 $1,510 $736
10,844
kWh
05 2.7243: Improve air circulation with destratification fans / other methods $7,525 $7,000 $7,525
110,785
kWh
TOTAL RECOMMENDED $11,419 $9,600 $11,419
170,281
kWh
TOTAL IMPLEMENTED $3,107 $2,360 $3,107
45,721
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs