ITAC Assessment: OD0128
ITAC logo
ITAC Assessment: OD0128
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Structural Lumber
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 54
Plant Area 50,000
ft2
Annual Production 35,000,000
units
Production Hrs. Annual 2,375
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $168,066 4,168,816
kWh
Electricity Demand $149,218 17,539
kW-mo/yr
Electricity Fees $4,283 -
Natural Gas $4,531 644
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,585 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings By-product Production Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,386 $1,800 $3,386
84,115
kWh
- - -
02 2.4113: Install motor voltage controller on lightly loaded motors $854 $1,290 $377
9,379
kWh
$477
-
kW-mo/yr
- -
03 2.7224: Reduce space conditioning during non-working hours $565 $420 $565
18,757
kWh
- - -
04 4.231: Purchase equipment instead of leasing $26,400 $47,500 - - $26,400 -
05 4.514: Re-arrange equipment layout to reduce handling costs $1,380 $1,155 - - - $1,380
TOTAL RECOMMENDED $32,585 $52,165 $4,328
112,251
kWh
$477
-
kW-mo/yr
$26,400 $1,380
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs